Research

year 2004 
author Jaewon Park 
Keyword wafer fabrication, due date assignment, similarity of process flow, artificial neural network 
Abstract Assigning due date and delivering timely are an important factor determining the competitive strength of a manufacturing company. Once an order received, we should check the inventory status before anything else. If the stock runs short, we should make the product. In this case, predicting the cycle time of the product is important for the due date assignment.
Due to the complicated process flow of wafer fabrication, distinctive approaches that differ from common scheduling method are required. Especially, more than one thousand different products might be produced simultaneously in wafer fabrication facilities producing multiple product types like ASIC or power semiconductor. Besides, each product type has different process flow and product types and layers that can be processed together in each batch processing equipment are predetermined. Because of Such characteristics, estimating the flow time of each product is very difficult task.
In this study, we propose a method to predict the cycle time and assign the due date as accurately as possible even if the product mix varies continuously. For this, we group the products according to the similarity of process flow and use the information from the groups to predict the cycle time using artificial neural network. The experimental results show that the proposed method is superior to common due date assignment method. 
c MS 

Download :

번호 c year 제목 author
26 PhD  2014  A study on integrative decision-making system for reconfigurable manufacturing cells Jin Wu Seo 
25 PhD  2014  Multi-level job scheduling in a flexible discrete-part production environment Hong Bum Na 
24 PhD  2013  A study on production scheduling problems considering differential electricity pricing and distributed generations Jun Young Moon 
23 PhD  2013  Price of Simplicity under Congestion: On the Revenue and Pricing Schemes in the Telecommunication Industry [58] file Dongmyung Lee 
22 PhD  2010  Enhancing Flexibility and Responsiveness in Sales Order Management [54] Mokmin Park 
21 PhD  2010  Framework for Integrative SRM System and Collaboration Scorecard [26] Jongkyoung Park 
20 PhD  2009  A Study for Business Process Improvement Using Real-time Information of Unbalanced Work [19] Jaehyun Kong 
19 PhD  2008  A study on integrated production planning and strategic framework in supply chain [15] Haejoong Kim 
18 PhD  2007  A Study on MRP Process Improvement in a Grid Enabled APS [2] file Hyoung-Gon Lee 
17 PhD  2005  Development of an algorithm for multi-plant production plans in a supply chain [50] Sungwon Jung 
16 PhD  2005  Performance Analysis and Network Design of Supply Chain for Strategic Decision Making [14] Eoksu Sim 
15 PhD  2005  A Study on the Integration of Quality Designing and Process Control in Steel Industry [15] Jonghan Kim 
14 PhD  2004  Ontology Development for e-Business Integration [26] Tai-Woo Chang 
13 PhD  2003  Process Modeling and Performance Analysis Methodology toward Optimal Design of Manufacturing Systems [30] Kichang Lee 
12 PhD  2002  Flexible Job Shop Scheduling with Multi-level Job Structures [16] Yangja Jang 
11 PhD  1999  A Study on the Manufacturing System State Based Scheduler using Neural Network and Simulator [20] Kitae Kim 
10 PhD  1999  A Study on Job Shop Scheduling Problems considering Production Capacity Adjustment [16] Daeyoung Chung 
9 PhD  1997  A Study on the Integration of Loading and Scheduling in Flexible Manufacturing Systems [21] Sangbok Woo 
8 PhD  1997  A Study on FMS Design Justification Considering Part Type Selection and Performance Evaluation Hosub Shin 
7 PhD  1997  Computer-Aided Synthesis of the Execution Controllers for Workcells in Computer Integrated Manufacturing Systems [18] Sangkyun Kim 
6 PhD  1997  A Study on the Integration of Process Planning and Scheduling [3] Kidong Kim 
5 PhD  1996  A Design Support System for the Process Design of Computer Integrated Manufacturing [2] Chankwon Park 
4 PhD  1996  An Improved Scheduling Heuristic Based on Batch Splitting Method for The Job Shop Scheduling Problem [4] Hanil Jeong 
3 PhD  1995  Design Support System for the Conceptual Design of Manufacturing Databases [13] Kitae Shin 
2 PhD  1994  A Study on Design of a Cooperative- Distributed Shop Floor Control System for Computer Integrated Manufacturing [19] Namkyu Park 
1 PhD  1991  An Integrated Decision Support System for FMS Planning and Control Problems [11] Seongyoung Jang