Research

year 1996 
author Hanil Jeong 
Keyword Batch Splitting, Improving Schedule, Job Shop Scheduling, Before-Arrival Family Setup Time, Branch and Bound 
Abstract The job shop scheduling problem has been a major target for many researchers. However, most of the past studies assumed that a job consists of only a single part. With this assumption, the master production schedule and MRP output must be modified when production requirement from MRP( Material Requirement Planning )for a planning period exceeds the capacity of production system.

In addition to that, a real factory is full of unexpectedness and dynamics. Due to such dynamic nature of shop floor, the requirements for production volume and due date can not easily be satisfied under the assumption that a job consists of a single part. In many cases of real manufacturing environment, however, a job does not consist of a single part but a set of parts of same type, so-called a batch. We can alleviate the problems mentioned above by considering characteristics of batch. That is to say, if we allow each part which constitute a batch to be processed independently, then we can obtain an improved schedule because we can fill up the idle times of machines with jobs of smaller processing time. However, then, the size of the scheduling problem would become too large to be solved in practical time limit, and the clerical work will also increase to handle the increased number of production orders. And so, there may be an optimum batch size considering trade-off between better solution and tractability.

We propose an improved scheduling algorithm when a job consists of a batch. For this algorithm, we try to minimize makespan or maximum lateness for job shop scheduling problem considering before-arrival family setup time, transportation time, release date and due date. Our scheduling algorithm can be divided into two parts. The first part selects a batch to be splitted and splits it into smaller batches. The second part solves the new job shop scheduling problem with smaller batches. The batch splitting algorithm selects a batch to be splitted based on information of lateness and idle time, and then its size is determined by batch splitting strategy. The proposed job shop scheduling algorithm contains a new branch and bound algorithm to minimize makespan for single machine sequencing problem considering before-arrival family setup time, release date and delivery time. This algorithm starts with obtaining a single machine sequencing problem using the characteristic values of operation from disjunctive graph which represents job shop scheduling problem. Final solution is obtained by applying proposed single machine sequencing algorithm iteratively. The proposed new branch and bound algorithm for single machine sequencing problem consists of five modules, they are branching, determining precedence, modifying characteristic values of operations, generating heuristic solution and calculating lower bound modules.

Experimental results show that the proposed single machine sequencing algorithm finds an optimal solution within small time limit. The proposed job shop scheduling algorithm shows better performance than tabu search, simulated annealing and genetic algorithm, and error rates compared to optimal solution is low. The batch splitting algorithm shows that only a few split can improve schedule considerably, and we can handle dynamic events more elegantly by this algorithm. 
c PhD 

Downlaod :

번호 c year 제목 author
61 MS  1993  A Study on Effects of Order Release Policies to Performance of Manufacturing Systems Choonghwan Ahn 
60 MS  1993  A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects Jangsuk Moon 
59 MS  1993  A Supervisory Control Approach to Rapid Implementation of Low-Level Control Software for FMC [1] Sangkyun Kim 
58 MS  1994  A Finitely Recursive Processes Approach to Modeling and Control of an FMC Jaeheuk Choi 
57 MS  1996  A Study on the Generation and DB Construction of Modular BOM [1] Yonggu Ji 
56 MS  1997  A Scheduling Algorithm Considering Subcontractor and Machine Setup Cost in MRP Environment [1] Kichang Lee 
55 MS  1997  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim 
54 MS  1997  A New Approach to Master Production Scheduling in the MRP environment [1] Sangdo Choi 
53 MS  1998  A study on an efficient real-time deadlock-free control algorithm by using graph-theoretic approach [27] Jungwoon Yoo 
52 MS  1998  A Study on UML representation of CIM-OSA and availability of analysis and design pattern in CIM-OSA [1] Seungoh Han 
51 MS  1998  Design of Integrated BOM Management System supporting Multiple Views Keumseok Kang 
50 MS  1999  An Evaluation of Workload Limited Order Release Strategies considering Planning Stage in a Jop Shop Byeongdae Choi 
49 MS  1999  A Study on the Development of Event-driven MRP Components Considering Capacity Constraints [1] Seunghyun Yoon 
48 MS  1999  A Study on the Implementation of the Speech Recognition System for the Real-Time Decision Support of Manufacturing Cells [18] Eoksu Sim 
47 MS  2000  A Study on Work Measurement Using Image Processing [8]
46 MS  2000  Design of a Hybrid System in Integrating Kanban with MRP [2] Taeyoung Song 
45 MS  2000  Job Shop Scheduling for Minimizing the Sum of Earliness and Tardiness Dongsu Park 
44 MS  2000  A Study on Integrated Production Planning of Distributed Manufacturing Systems on Supply Chain Dosung Go 
43 MS  2001  A Study of Decision Support for the implementation of Cellular Manufacturing Systems. [1] Muynghee Byun 
42 MS  2001  A Study on Components Development for Production Management Daiki Min 
41 MS  2002  Design and Implementation of Model Management System for Supply Chain Planning [1] Youngcheol Yang 
40 MS  2002  A combined DEA and BSC methodology for evaluating organization efficiency [1] Bumsoo Kim 
39 MS  2003  Design of a BOF Blowing Control Model Using Artificail Intelligence Jungjoon Park 
38 MS  2003  Production Planning and Distribution Planning using Demand based mixed Genetic Algorithm in a Supply Chain Jung Im 
37 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
36 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
35 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang 
34 MS  2004  A Design on Cost-Estimation Support System for Injection Mold Using AI Method [12] Gunhee Kim 
33 MS  2004  A study on due-date assignment method in wafer fabrication facility producing multiple product types [3] Jaewon Park 
32 MS  2005  A Study on RFID application in Reverse Supply Chain [3] Dongjoon Lim 
31 MS  2005  Development of Reference Model and Strategic Road Map for the Implementation of a Reverse Supply Chain [183] Chihoon Lim 
30 MS  2005  A Study on Developing of Position collecting Vision system Using Marker [1] Jiyoon Park 
29 MS  2005  A Study on Product Development Methodology in Reverse Supply Chain [77] Joon Kim 
28 MS  2006  A Study on the Application of Group Technology for Naval Ship Design And Manufacturing: Relating to Platform Family Architecture [17] Gwangjae Park 
27 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
26 MS  2006  A Study on the Assessment Method of Installation and Operation Cost in a Reverse Supply Chain [2] file Hyunjong Jeong 
25 MS  2007  A Study on the Valuation of a Supply Chain Considering Management Efficiency and Environmental Effect [53] Jiyoun Kim 
24 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
23 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
22 MS  2009  A Study on Integrated Risk Management in Supply Chain - Focusing on High-tech Electronic Industry [52] file Kanghyun Kim 
21 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
20 MS  2009  A Study on the Economic Feasibility of Automated Identification Technology on the ELV Management Process [25] file Kiheon Nam 
19 MS  2007  A Study on Project Risk Management based on Earned Value Management [25] file Hyunil Noh 
18 MS  2007  A Study on BOM for Enhancing Efficiency of Reverse Supply Chain [14] Jinseon Yoo 
17 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
16 MS  2007  A Simulation Study on the Impact of RFID Technology on the Supply Chain Counting Process [13] file Jangwon Cho 
15 MS  2008  A study on supplier's performance measurements for a supply chain on a new product environment [1] Jungsub Lee 
14 MS  2008  Integration of RFID and Web Service Technology in Manufacturing Systems [20] file Gunnam Ong 
13 MS  2011  A Study on RMC Scheduling using Simulation [19] Jeongho Park 
12 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon