Research

year 1999 
author Daeyoung Chung 
Keyword job shop scheduling, production planning, operation subcontract, overtime, decomposition 
Abstract Reliable and timely delivery is an important factor determining the competitive strength of a manufacturing company. In some environment, keeping due date is considered as a constraint whose violation is not permitted. However, a production plan and promised due dates usually cannot be accomplished owing to diverse reasons including insufficient production capacity and unexpected events. To cope with such problems, loads are modified using alternative routing, subcontracting, overtime work, etc. Capacity adjustments are usually considered in production planning, but the plan cannot correctly reflect the limited capacities of production resources. So the intervention of human planner is inevitable to rectify the plan, but the performance of the resulting plan is usually inferior with respect to costs because the human planner does not have proper decision support tools. To make a cost efficient plan, the capacity adjustment should be considered at scheduling level.

This paper deals with a job shop scheduling problem considering operation subcontract and overtime work. The problem has more decision variables and complex constraints than the pure job shop scheduling problem, which traditionally has been regarded as one of the most difficult combinatorial optimization problems. Due to the characteristic of the problem, decomposition and synthesis method is proposed to get the solution. First, the solution method starts with a traditional job shop scheduling problem with an objective of minimizing the violation of due date constraints. Second, the subcontract operations are repeatedly selected to reduce the remaining violation while minimizing the costs. At each iteration step, the overtime plans are modified to minimize the total cost of adjusting production capacities. Incidentally, the proposed solution methodology could also be utilized to solve an independent sub-problems of this type.

Next, a job shop scheduling problem with an objective of minimizing maximum lateness is addressed, and an optimization method and a heuristic algorithm are developed. The optimization method transforms the problem into a series of constraint satisfaction problems (CSP), and solves the CSP until an optimal solution is found. In this research, a new variable ordering / value ordering method and an improved dichotomous search method are introduced. Being implemented with an efficient constraint propagation technique, the suggested method shows superior performance than the other existing methods. The heuristic algorithm aims to find good solutions by improving the schedules obtained by widely used dispatching rules. The algorithm is designed to incrementally reduce the maximum lateness by repeatedly re-sequencing the jobs on bottleneck machines with Carlier´s algorithm. Perceiving that the jobs spend much waiting time owing to poor sequencing decisions, the algorithm is designed to select the bottleneck machine by relaxing the capacity constraint. The suggested method was shown to improve the quality of the solution more than the critical pair-wise exchange method in a very short time.

Next, a job shop scheduling problem considering operation subcontract is defined, and its solution method is suggested. The problem is decomposed into two sub-problems that are much related with each other, and so we would better not to use a sequential approach. Reflecting the relationship of the sub-problems, a solution method that deals with the sub-problems in an integrated manner is developed. In short, re-sequencing of the jobs and the selection of subcontracting operations are repeatedly conducted on bottleneck machines. To select the subcontracting operations with minimum cost, a branch and bound algorithm was developed. However, during the actual application of the algorithm, it was discovered that the maximum lateness cannot be decreased sometimes. To clear the cause of the stall and to make a way out, an algorithm that transforms the problem into a maximum flow problem is also developed. Through experiments, it is shown that the suggested solution method outperforms the conventional method and the sequential approaches.

Overtime scheduling is a difficult problem that must consider the time availability of production resources. An implicit representation method that relaxes the time availability constraint and a time-based decomposition method are used to circumvent the difficulties. As a result, the original problem can be solved by successive determination of overtime production quantity in each period. To determine the overtime quantity of a period, a linear programming model is used. The LP model considers the constraints occurred by the release time of a job and the operations planned to be subcontract.

The results of this study can be utilized to support the decision making of a human planner by generating a plan with minimum cost. Also this study may be considered as one of the first attempts to integrate the production planning problems and production scheduling problems. 
c PhD 

Download :

번호 c year 제목 author
61 MS  1993  A Study on Effects of Order Release Policies to Performance of Manufacturing Systems Choonghwan Ahn 
60 MS  1993  A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects Jangsuk Moon 
59 MS  1993  A Supervisory Control Approach to Rapid Implementation of Low-Level Control Software for FMC [1] Sangkyun Kim 
58 MS  1994  A Finitely Recursive Processes Approach to Modeling and Control of an FMC Jaeheuk Choi 
57 MS  1996  A Study on the Generation and DB Construction of Modular BOM [1] Yonggu Ji 
56 MS  1997  A Scheduling Algorithm Considering Subcontractor and Machine Setup Cost in MRP Environment [1] Kichang Lee 
55 MS  1997  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim 
54 MS  1997  A New Approach to Master Production Scheduling in the MRP environment [1] Sangdo Choi 
53 MS  1998  A study on an efficient real-time deadlock-free control algorithm by using graph-theoretic approach [27] Jungwoon Yoo 
52 MS  1998  A Study on UML representation of CIM-OSA and availability of analysis and design pattern in CIM-OSA [1] Seungoh Han 
51 MS  1998  Design of Integrated BOM Management System supporting Multiple Views Keumseok Kang 
50 MS  1999  An Evaluation of Workload Limited Order Release Strategies considering Planning Stage in a Jop Shop Byeongdae Choi 
49 MS  1999  A Study on the Development of Event-driven MRP Components Considering Capacity Constraints [1] Seunghyun Yoon 
48 MS  1999  A Study on the Implementation of the Speech Recognition System for the Real-Time Decision Support of Manufacturing Cells [18] Eoksu Sim 
47 MS  2000  A Study on Work Measurement Using Image Processing [8]
46 MS  2000  Design of a Hybrid System in Integrating Kanban with MRP [2] Taeyoung Song 
45 MS  2000  Job Shop Scheduling for Minimizing the Sum of Earliness and Tardiness Dongsu Park 
44 MS  2000  A Study on Integrated Production Planning of Distributed Manufacturing Systems on Supply Chain Dosung Go 
43 MS  2001  A Study of Decision Support for the implementation of Cellular Manufacturing Systems. [1] Muynghee Byun 
42 MS  2001  A Study on Components Development for Production Management Daiki Min 
41 MS  2002  Design and Implementation of Model Management System for Supply Chain Planning [1] Youngcheol Yang 
40 MS  2002  A combined DEA and BSC methodology for evaluating organization efficiency [1] Bumsoo Kim 
39 MS  2003  Design of a BOF Blowing Control Model Using Artificail Intelligence Jungjoon Park 
38 MS  2003  Production Planning and Distribution Planning using Demand based mixed Genetic Algorithm in a Supply Chain Jung Im 
37 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
36 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
35 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang 
34 MS  2004  A Design on Cost-Estimation Support System for Injection Mold Using AI Method [12] Gunhee Kim 
33 MS  2004  A study on due-date assignment method in wafer fabrication facility producing multiple product types [3] Jaewon Park 
32 MS  2005  A Study on RFID application in Reverse Supply Chain [3] Dongjoon Lim 
31 MS  2005  Development of Reference Model and Strategic Road Map for the Implementation of a Reverse Supply Chain [183] Chihoon Lim 
30 MS  2005  A Study on Developing of Position collecting Vision system Using Marker [1] Jiyoon Park 
29 MS  2005  A Study on Product Development Methodology in Reverse Supply Chain [77] Joon Kim 
28 MS  2006  A Study on the Application of Group Technology for Naval Ship Design And Manufacturing: Relating to Platform Family Architecture [17] Gwangjae Park 
27 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
26 MS  2006  A Study on the Assessment Method of Installation and Operation Cost in a Reverse Supply Chain [2] file Hyunjong Jeong 
25 MS  2007  A Study on the Valuation of a Supply Chain Considering Management Efficiency and Environmental Effect [53] Jiyoun Kim 
24 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
23 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
22 MS  2009  A Study on Integrated Risk Management in Supply Chain - Focusing on High-tech Electronic Industry [52] file Kanghyun Kim 
21 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
20 MS  2009  A Study on the Economic Feasibility of Automated Identification Technology on the ELV Management Process [25] file Kiheon Nam 
19 MS  2007  A Study on Project Risk Management based on Earned Value Management [25] file Hyunil Noh 
18 MS  2007  A Study on BOM for Enhancing Efficiency of Reverse Supply Chain [14] Jinseon Yoo 
17 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
16 MS  2007  A Simulation Study on the Impact of RFID Technology on the Supply Chain Counting Process [13] file Jangwon Cho 
15 MS  2008  A study on supplier's performance measurements for a supply chain on a new product environment [1] Jungsub Lee 
14 MS  2008  Integration of RFID and Web Service Technology in Manufacturing Systems [20] file Gunnam Ong 
13 MS  2011  A Study on RMC Scheduling using Simulation [19] Jeongho Park 
12 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon