Research

year 1991 
author Seongyoung Jang 
Keyword FMS, DSS, 0-1 integer programming, hierarchical approach, production planning & planning 
Abstract This paper discusses the FMS production planning and scheduling problems and proposes a decision support system( FMSDS ) for those problems. FMSDS consists of data handling modules, production planning module, system performance collection module, scheduling module and simulation module. The key function of FMSDS is production planning. Because of the complexity of production planning problems, two alternative solution strategies are suggested. In the first solution strategy which is called "solution strategy with existing planning hierarchy ", the production planning problem is considered as part type selection, loading and loading adjustment problems. And then formulation and multiple loop solution algorithms are developed considering the hierarchical relationships between subproblems. In the second solution strategy which is called "solution strategy with modified planning hierarchy", the production planning problem is divided into routing, part type selection, and tool solution strategies, this thesis illustrated numerical examples according to the solution strategies and loading objectives. Also, comparisons of system performances resulting from the combinations of solution strategies are given by employing steady-state simulation techniques. The solution strategy with modified planning hierarchy performs far better than those with existing planning hierarchy. So, total throughput increased about 10-16^% and the job tardiness greatly decreased. Finally, with reference to the Chen´s model, one of the rare research results considering integrated production planning problems for FMS, the model proposed in this dissertation shows better system performances than the Chen´ model does. The system performances of solution strategy with existing planning hierarchy are as good as or equal to those of the Chen´s model in production quantity but much better in job tardiness. The system performances of solution strategy with modified planning hierarchy, however, are even better than those of the Chen´s model in both throughput and job tardiness. 
c PhD 

Downlaod :



번호 c year 제목 author
26 PhD  1995  Design Support System for the Conceptual Design of Manufacturing Databases [13] Kitae Shin 
» PhD  1991  An Integrated Decision Support System for FMS Planning and Control Problems [11] Seongyoung Jang 
24 PhD  1994  A Study on Design of a Cooperative- Distributed Shop Floor Control System for Computer Integrated Manufacturing [19] Namkyu Park 
23 PhD  1996  An Improved Scheduling Heuristic Based on Batch Splitting Method for The Job Shop Scheduling Problem [4] Hanil Jeong 
22 PhD  1996  A Design Support System for the Process Design of Computer Integrated Manufacturing [2] Chankwon Park 
21 PhD  1997  A Study on the Integration of Process Planning and Scheduling [3] Kidong Kim 
20 PhD  1997  Computer-Aided Synthesis of the Execution Controllers for Workcells in Computer Integrated Manufacturing Systems [18] Sangkyun Kim 
19 PhD  1997  A Study on FMS Design Justification Considering Part Type Selection and Performance Evaluation Hosub Shin 
18 PhD  1997  A Study on the Integration of Loading and Scheduling in Flexible Manufacturing Systems [21] Sangbok Woo 
17 PhD  1999  A Study on Job Shop Scheduling Problems considering Production Capacity Adjustment [16] Daeyoung Chung 
16 PhD  1999  A Study on the Manufacturing System State Based Scheduler using Neural Network and Simulator [20] Kitae Kim 
15 PhD  2002  Flexible Job Shop Scheduling with Multi-level Job Structures [16] Yangja Jang 
14 PhD  2003  Process Modeling and Performance Analysis Methodology toward Optimal Design of Manufacturing Systems [30] Kichang Lee 
13 PhD  2004  Ontology Development for e-Business Integration [26] Tai-Woo Chang 
12 PhD  2005  A Study on the Integration of Quality Designing and Process Control in Steel Industry [15] Jonghan Kim 
11 PhD  2005  Performance Analysis and Network Design of Supply Chain for Strategic Decision Making [14] Eoksu Sim 
10 PhD  2005  Development of an algorithm for multi-plant production plans in a supply chain [50] Sungwon Jung 
9 PhD  2008  A study on integrated production planning and strategic framework in supply chain [15] Haejoong Kim 
8 PhD  2009  A Study for Business Process Improvement Using Real-time Information of Unbalanced Work [19] Jaehyun Kong 
7 PhD  2010  Framework for Integrative SRM System and Collaboration Scorecard [26] Jongkyoung Park 
6 PhD  2007  A Study on MRP Process Improvement in a Grid Enabled APS [2] file Hyoung-Gon Lee 
5 PhD  2010  Enhancing Flexibility and Responsiveness in Sales Order Management [54] Mokmin Park 
4 PhD  2013  Price of Simplicity under Congestion: On the Revenue and Pricing Schemes in the Telecommunication Industry [58] file Dongmyung Lee 
3 PhD  2013  A study on production scheduling problems considering differential electricity pricing and distributed generations Jun Young Moon 
2 PhD  2014  Multi-level job scheduling in a flexible discrete-part production environment Hong Bum Na 
1 PhD  2014  A study on integrative decision-making system for reconfigurable manufacturing cells Jin Wu Seo