lab sem test
Date : 2011/07/07 
작성인 : 서진우 
Key Words : Load Leveling, Shipyard 
List of Articles
번호 제목 작성인
246 2011 empowerment scheduling for field workforce file 한수민 
245 2011 Developing Practical Machine Scheduler(비공개) 서진우 
244 2011 The algorithm for resource leveling file 김성훈 
243 2011 프로젝트 제안 PPT 황규선 
242 2011 Flight and Maintenance Planning of Military Aircraft file 박준호 
241 2011 topics related to VRP 한수민 
240 2011 Vehicle Routing Problem file 이성진 
239 2011 Operational and environmental performence measures in CLSC 이재봉 
» 2011 Load Leveling in shipyard(비공개) 서진우 
237 2011 Centralized Fleet Management System for Automated Transportation System file 김영우 
236 2011 Resource leveling problem file 김성훈 
235 2011 Object Process Methodology for Manufacturing Execution System based on International Standard 황규선 
234 2011 Lean-pull strategy in a re-entrant manufacturing environment 이재봉 
233 2011 Flight and Maintenance Planning of Military Aircraft file 박준호 
232 2011 A modeling framework for facility location problem 김정훈 
231 2011 My research direction in project scheduling file 김성훈 
230 2011 A study on the number of Pallets in RMC file 한수민 
229 2011 Legislation Analysis for Closed-loop Supply Network file 김영우 
228 2011 A CSP-based Load Leveling Algorithm for Ship Block Erection Network 황규선 
227 2011 Scheduling preventive maintenance for aircraft engine file 박준호 
226 2011 Project selection and scheduling with completion time dependent returns file 김성훈 
225 2011 A Model for Coordinated Closed-loop Supply Chain 김영우 
224 ~2010 think about thesis file 태경휘 
223 ~2010 Power-aware scheduling for makespan and flow file 이성진 
222 ~2010 Assessing environmental performance by combining life cycle assessment, multi-criteria analysis and environmental performance indicators file Louis 
221 ~2010 Multi-dimensional Knapsack Problem using GA file 서진우 
220 ~2010 Aircraft availability Scheduling preventive maintenance Sorties Allocation OR in military 박준호 
219 ~2010 Smart Grid: Energy Consumption Scheduling & Real-time Pricing file 이동명 
218 ~2010 simulation framework for small scale engagement file 김정훈 
217 ~2010 Resource reallocation techniques considering probability of compliance in multi-project management file 김성훈 
216 ~2010 Function Point & Software effort estimation file 한수민 
215 ~2010 2010 Software Costing Standard file 김영우 
214 ~2010 Smart grid + EPCglobal network file 태경휘 
213 ~2010 Joint Optimisation of Spare Part Inventory, Maintenance Frequency and Repair Capacity for k-out-of-N Systems file 박준호 
212 ~2010 Lean development & SPI-LEAM file 한수민 
211 ~2010 Resource-constrained multi-project scheduling file 김성훈 
210 ~2010 Software Development Effort Estimation Considering Complexity using Radial Basis Function Network(working paper) 김영우 
209 ~2010 Product-Service System & 논문 아이디어 (비공개) 윤소연 
208 ~2010 competitive advantage of RFID in SCM 태경휘 
207 ~2010 Optimization of Ship Design within an Integrated Multimodal Transport System Louis