author Hyoung-Gon Lee 
2nd author / Namkyu Park (Dept. of Industrial and Manufacturing Engineering, Wayne State University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
info This paper was accepted on 2008/4.
The online document code of this paper is '10.1080/00207540802132775'.
International Journal of Production Research (SCI, 0.774), Vol. 47, No. 8, pp.2109-2123, 2009 
year 2009 
c IJ 
저널/학회 IJPR 
group SCI 
keyword material requirement planning; computational grid; capacity constraints; longest tail first rule 
abstract Material requirement planning (MRP) process generates a production plan which guarantees an exact quantity of the right materials available at the needed time. Providing an executable production plan at high speed has remained a goal for MRP since the process was first developed in the 1970s. However, due to the time consuming characteristic of the process with its intensive database interaction, real time processing remained unattainable. Moreover, this performance issue became worse, as the utilization of production resources on the shop floor are expected to be maximized by the process due to a dynamic market environment. This paper presents a recent work by the authors on the concept of using computational grid to achieve a breakthrough in its performance under conditions of finite capacity. The proposed system resolves capacity constraints by applying a simple heuristic called longest tail first rule, which is proved to minimize the total lead time, to each distributed cluster obviating the need for any rescheduling procedures. Implementation of this concept in a distributed database environment and its performance analysis are described. The experimental results suggest that the proposed finite capacitated MRP process has desirable characteristics in terms of processing time with a deep bill of material as in current supply chain practice. 
번호 c 저널/학회 group 제목 author year
19 DJ  IE Interfaces    ILOG를 활용한 금형 생산시스템의 일정계획 시스템 개발에 관한 연구 file Hanil Jeong  2000 
18 IJ  IJPR  SCI  A Batch Splitting Method for Job Shop Scheduling Problem in MRP Environment file Hanil Jeong  1999 
17 DJ  산업공학    FMS 부하할당과 일정계획에 대한 통합적 접근법 file Sangbok Woo  1999 
16 DJ  시뮬레이션    생산 계획 및 우선순위 규칙에 따른 Order Release 정책의 유효성에 관한 연구 Byeongdae Choi  1999 
15 DJ  산업공학    Value Clustering Method를 통한 Modular BOM의 생성과 데이터베이스의 효율적인 구축에 관한 연구 file Yonggu Ji  1998 
14 IJ  C&IE  SCIE  A Decision Support Model for the Initial Design of FMS file Hosub Shin  1997 
13 IJ  C&IE  SCIE  A Batch Splitting Heuristic for Dynamic Job Shop Scheduling Problem file Hanil Jeong  1997 
12 DJ  시뮬레이션    CIM환경에서 프로세스 설계를 위한 시뮬레이션 코드의 자동생성에 관한 연구 Chankwon Park  1997 
11 DJ  산업공학    AND/OR 그래프를 이용한 공정계획과 일정계획의 통합에 관한 연구 file Kidong Kim  1997 
10 DJ  산업공학    수요 및 생산특성에 따른 생산통제 기법간의 효율성 분석에 대한 연구 file Janghan Lee  1997 
9 IJ  IJAMT  SCIE  An Integrated Decision Support System for FMS Production Planning and Scheduling Problems file Seongyoung Jang  1996 
8 IJ  C&IE  SCIE  Developing a Shop Floor Scheduling and Control Software for an FMS file Daeyoung Chung  1996 
7 DJ  CALSE/EC    기능모형으로부터 프로세스흐름 모형으로의 변환을 통한 시스템의 개념적 설계에 대한 연구 file Chankwon Park  1996 
6 DJ  경영과학    Design and Specification of a Low-Level Control Software for an FMC Using Supervisory Control Theory file Sangkyun Kim  1995 
5 DJ  경영과학    기록기반형 전문가시스템을 이용한 CIM 데이타베이스의 통합 file Namkyu Park  1994 
4 DJ  IE Interfaces    현장상황을 고려한 회전형상 부품의 공정계획 시스템 구축과 운영에 관한 연구 file Sungbum Chun  1994 
3 DJ  경영과학    제조 데이타베이스 설계에서의 뷰 통합 방안 file Kitae Shin  1994 
2 DJ  시뮬레이션    FMS 생산계획에서의 대기 네트워크 모델의 적용 가능성에 관한 연구 file Jinwoo Park ()  1992 
1 DJ  경영과학    FMS의 생산계획 및 일정계획을 위한 의사결정 지원시스템의 개발 file Seongyoung Jang ()  1991