author Daeyoung Chung 
2nd author / Kichang Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 08월 02일 ~ 2000년 08월 04일
City: Bangkok
Nation: Thailand
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Job Shop, Scheduling, Due Date 
abstract We consider a kind of job shop scheduling problem where each job has its due date. Temporal adjustment of machine capacities is possible through outsourcing with subcontractors when the due dates cannot be kept. In practice, outsourcing of operations is not rare in many types of manufacturing industries. e.g. machining, printing, etc. And practice of outsourcing will increase in accordance, with the emerging new manufacturing paradigms, such as virtual or holonic manufacturing. We present a heuristic solution procedure that addresses the total job-shop scheduling problem by solving a series of smaller sub-problems to optimality. For the sake of efficiency,the algorithm repeatedly executes in two steps on bottleneck machines-(1)improving the sequence of operations and (2) picking out the operations to be subcontracted. Experimental results prove that the suggested algorithm outperforms traditional methods. 

Download:

번호 category 학회 제목 author presenter year
55 IC  AsiaSim  A Study on Simulation Model for Yard Layout Planning in Offshore Plant Industry file Kim Hyun Jun  Kim Hyun Jun  2015 
54 IC  AsiaSim  An Economic Analysis on RFID Impact in Supply Chain Kiheon Nam    2008 
53 IC  IFAC on IMS  A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment Kidong Kim    1997 
52 IC  APIEMS  A Study on Developing a Scheduling System in Alternative Routing and Machine Environment Kidong Kim    1999 
51 IC  ICPR  A Scheduling Algorithm considering Subcontract cost in MRP Environment Kichang Lee    1997 
50 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
49 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
48 IC  Asian eBiz  Supplier Responsiveness Metrics for Supplier Selection in a New Product Launch Environment Jungsub Lee    2008 
47 IC  APIEMS  A genetic algorithm based approach for the periodic vehicle routing problem Joon Yung Moon    2009 
46 IC  APMS  Modeling and optimization of unrelated parallel machine scheduling problem with time-dependent and machine-dependent electricity cost Joon Yung Moon    2011 
45 IC  ICARCV  A Discrete Control Approach to Robotic Cell Operating System Design Jonghun Park    1996 
44 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
43 IC  INFORMS-KORMS  Hybrid Algorithms in Integrated Quality Design & Scheduling Jonghan Kim    2000 
42 IC  CIE  Decision support system for preliminary cost estimation with case based reasoning file Jonghan Kim    2004 
41 IC  AsiaSim  A Study on the Effects of Highlighted Display on Knowledge Worker Productivity Jinwu Seo    2009 
40 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
39 IC  AsiaSim  Developing a Practical Machine Scheduler for Worker-Involved Reconfigurable Manufacturing Systems Jinwu Seo    2011 
38 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
37 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
36 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005