author Haejoong Kim 
2nd author Jinwoo Park
Hanil Jeong 
presenter  
info This conference paper has been presented by Haejoong Kim on the International workshop on Institutional View of SCM. The conference has been held in Tokyo, Japan, 2006/11/16 ~ 2006/11/18 . 
year 2006 
category IC 
start / end date  
city / nation  
학회 ISCM 
keywords production planning and scheduling, supply chain management, lot sizing and scheduling, genetic algorithm 
abstract Production planning and scheduling (PPS) is one of the core functions in the management of manufacturing industries and its importance is further emphasized by the growing attention focused on supply chain management.

Most of the many studies on PPS have adopted a multi-phased, hierarchical approach in which the production plan is generated at high level, and then the schedule is generated at detailed level. One of the major problems of this approach is that it does not guarantee a feasible schedule with a given production plan. To resolve these limitations, many researchers have tried to integrate the planning and scheduling problems. However, these studies have also suffered limitations due to their intrinsic characteristics and the method for incorporating the hierarchical product structure into the scheduling model.

In this paper we present a new integrated model for PPS based on the lot sizing approach, which we term the Job-based Multi-level lot sizing and Scheduling Model (JMSM). Unlike previous lot sizing approaches, detailed scheduling constraints and practical planning criteria are incorporated into our model. We address a mathematical formulation, propose heuristic solution procedures, and demonstrate the performance of our model by comparing the experimental results with those of other traditional and integrated approaches.

Keyword: production planning and scheduling, supply chain management, lot sizing and scheduling, genetic algorithm 

Download :

번호 category 학회 제목 author presenter year
75 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
74 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
73 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
72 IC  ICPR  A Scheduling Algorithm considering Subcontract cost in MRP Environment Kichang Lee    1997 
71 IC  IFAC on IMS  A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment Kidong Kim    1997 
70 IC  APIEMS  An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System Sangbok Woo    1999 
69 IC  APIEMS  A Study on Developing a Scheduling System in Alternative Routing and Machine Environment Kidong Kim    1999 
68 IC  IW on IMS  Maximally permissive adaptive control of an automated manufacturing cell Sangkyun Kim    1999 
67 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
66 IC  INFORMS-KORMS  Hybrid Algorithms in Integrated Quality Design & Scheduling Jonghan Kim    2000 
65 IC  INFORMS-KORMS  Development of capacitated event-driven MRP components using object oriented method Seunghyun Yoon    2000 
64 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
63 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
62 IC  GECCO  A Study on the Resource Allocation Planning for Automated Container Terminals Yangja Jang    2001 
61 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
60 IC  ICRA  An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State file Kitae Kim    2001 
59 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
58 IC  ICMA  Machine-Understandable e-Business Modeling with Ontology Tai-Woo Chang    2002 
57 IC  Asian eBiz  A Systematic Approach for Ontology-based e-Business Modeling Tai-Woo Chang    2002 
56 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002