author Kichang Lee 
2nd author / Kitae Kim (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 1997년 08월 04일 ~ 1997년 08월 05일
City: Osaka
Nation: Japan
Additional Information:
The 14th International Conference on Production Research, pp.1068-1071. 
year 1997 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Scheduling, Due Date, Subcontract Cost, Heuristic 
abstract Customer satisfaction is becoming more and more important issue in enterprise environments these days. And meeting due-dates may be one of the most critical necessary conditions in satisfying customer needs. In this respect, many researchers have tried to develop good scheduling algorithms to observe due-dates. Most of these efforts tried to minimize some tardiness related measures by assigning heavy penalty costs when due-dates are violated while considering fixed production capacities. A more practical approach to circumvent the problem may be to use subcontracting mechanism. The production environment of this research may be considered as a flexible flow line. And the objective function of the problem is to minimize the subcontract cost while observing due-date and focusing on the possibilities of subcontracting. The solution methodology adopted in this research is an effective heuristic algorithm based on backward schedule generation and forward search & modification method. The experimental results of this heuristic were shown to be very fast and efficient and in many cases were same with optimal solution.. 

Download:

번호 category 학회 제목 author presenter year
55 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
54 IC  IBERC  An Ontology-Based Framework for e-Business Integration file Tai-Woo Chang    2003 
53 IC  ICPR  Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain file Sungwon Jung    2003 
52 IC  CIE  Decision support system for preliminary cost estimation with case based reasoning file Jonghan Kim    2004 
51 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
50 IC  GECCO  A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm file Eoksu Sim    2004 
49 IC  AsiaSim  Vendor Managed Inventory and its value in the various supply chain Sungwon Jung    2004 
48 IC  AsiaSim  Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling file Eoksu Sim    2004 
47 IC  AsiaSim  Reorder decision system based on the concept of the order risk using neural networks Sungwon Jung    2004 
46 IC  CIE  Information Strategy Planning for the Korean Postal Address Database file Tai-Woo Chang    2004 
45 IC  e-Biz  Design of Information System for e-Logistics Kitae Shin    2004 
44 IC  ICCSA  Efficient Mapping Rule of IDEF for UMM Application file Kitae Shin    2005 
43 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
42 IC  Asian eBiz  Applying Negotiation Patterns in Supply Chain Planning based on Self-integrating Environment file Yuncheol Kang    2005 
41 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
40 IC  ISFA  A framework for the ubiquitous MES using RFID and Web services technology file Manchul Han    2006 
39 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
38 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
37 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
36 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007