author Hongbum Na 
2nd author Hyoung-Gon Lee
Jinwoo Park 
presenter  
info This conference paper has been presented by Hongbum Na on the 한국정밀공학회 학술대회. The conference has been held in 경주, , 2006/5/17 ~ 2006/5/19 . 
year 2006 
category DC 
start / end date  
city / nation  
학회 정밀공학 
keywords (자재소요계획), Production capacity(생산용량), Tree structured BOM(트리 구조의 자재명세서) 
abstract The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans. 

Download :

번호 category 학회 제목 author presenter year
134 DC  공동학회春  Development of a Shop-floor Scheduling and Control Software Based on Bidding Algorithm Daeyoung Chung    1995 
133 DC  공동학회春  Design and Specification of Low-Level Control Softwares for FMC using Supervisory Control Theory Sangkyun Kim    1995 
132 DC  시뮬레이션春  Simulation modeling of JIT System Kitae Kim    1995 
131 DC  공동학회秋  A Study on Modeling and Control of an FMC using Finitely Recursive Process Jaeheuk Choi    1995 
130 DC  산업공학秋  일정계획의 수행도를 고려한 공정 경로와 가공 기계 선정에 관한 연구 Kidong Kim    1996 
129 DC  공동학회春  An Approximation Method for Job Shop Scheduling Problem with Sequence Independent Setup Time Hanil Jeong    1996 
128 DC  공동학회春  A Study on Part Selection Problem at Initial Design Stage of FMS Hosub Shin    1996 
127 DC  공동학회春  Function-to-Process Flow Model Transformation for Design of CIM Chankwon Park    1996 
126 DC  전문가시스템秋  사례기반 추론에서 Fuzzy 개념을 이용한 유사사례 추출 Jonghan Kim    1996 
125 DC  공동학회春  철강산업에서 용선제조비용 최소화를 위한 최적화모형 개발 Jonghan Kim    1997 
124 DC  공동학회春  A scheduling algorithm considering subcontract cost in MRP environment Kichang Lee    1997 
123 DC  시뮬레이션春  FMS 스케줄링을 위한 Priority 함수의 자동 생성에 관한 연구 Kitae Kim    1997 
122 DC  시뮬레이션秋  금형 생산 시스템의 일정 계획 시스템 개발에 관한 연구 Daeyoung Chung    1997 
121 DC  경영과학秋  군집합 방법을 이용한 모듈라 자재명세서 생성 Jonghan Kim    1997 
120 DC  공동학회春  생산시스템의 지식획득을 위한 Intelligent Simulator설계에 관한 연구 Kitae Kim    1998 
119 DC  공동학회春  Multiple Views를 지원하는 통합 BOM관리 시스템의 구조 설계 Keumseok Kang    1998 
118 DC  시뮬레이션春  시뮬레이션을 이용한 기관차 용선수송작업 능률 향상방안에 관한 연구 Jonghan Kim    1998 
117 DC  산업공학秋  부품상태기반 시뮬레이터와 상태기반일정계획에 관한 연구 Kitae Kim    1998 
116 DC  산업공학秋  외주를 고려한 납기제약 일정계획 문제에 관한 연구 Daeyoung Chung    1998 
115 DC  산업공학秋  부품상태기반 일정계획 시뮬레이터의 개발에 관한 연구 Kitae Kim    1998