author Kim Hyun Jun 
2nd author Jinwoo Park
Sunghoon Kim
Sang Hyup Lee
Seung Jin Ha 
presenter Kim Hyun Jun 
info This conference paper has been presented by Kim Hyun Jun the Asia-Simulation Conference. The conference has been held in Jeju, Korea, Republic of, 2015/11/04 ~ 2014/11/07 . 
year 2015 
category IC 
start / end date 2015-11-04 ~ 2015-11-07 
city / nation Jeju / Korea 
학회 AsiaSim 
keywords Lay-out Planning, Priority Policy, Dynamic Programming, Simulation 
abstract Though numerous studies have dealt the lay-out planning methods for shipbuilding industry, in practice the lay-out planning is still done by people under the rule of thumb. It seems illogical to treat such key resource without any scientific management, however matters such as reliability, frequent modifications, and lack of data makes it hard to adapt an automated method in such spatial planning.
To investigate on this problem this paper examines a heavy industry company in Korea and executes a simulation study. The targeted company produces numerous types of offshore plants which all follows varying production processes. So it is told that there exists some special difficulties in predicting and managing newly given constructions. Also another characteristic that makes managing such work difficult is that there exists frequent change requests to design process, quantity, and schedule.
Like many other competitive companies, company H still relies solely on human resource to plan the lay-outs without using any automated systems. This could cause problems such as long hours spent in planning/evaluating the lay-out plan and the difficulty in attaining a substitute for such planning jobs. This is because the current lay-out planning process depends heavily on the experiences of the planner. The difficulty of training a worker to become such specialist is one thing, but to find a substitute in the case of emergency is a more serious problem.
To solve this problem this paper suggests a practical algorithm that can deploy the blocks under a short given time. The system would automatically prioritize the blocks that needs to be placed on the yards and find a location that could maximize the yard utilization and minimize the delays on the site. However because of the uncertainties in the field, such as assembly modifications, contract date delays, and variations in the processing time, it is extremely difficult to find an optimal solution in such short given time.
Studies done by Li(2005) have divided the lay-out process into two separate steps, prescheduling and spatial planning. Here the second step utilized the genetic algorithm. Other researches such as Raj(2007) treated this problem as a 3D bin packing problem, while Zheng(2011) approached this matter using greedy algorithm to minimize the makespan. However none of the previous works considered the uncertainties that exits on the spatial planning process.
So to aid the suggested problem this simulation study aims to find a priority rule to deploy the blocks while considering the uncertainties. Measures such as block size, delayed time of the selected block, and so on would be examined through simulation to find the best performing weights for such variables. Blocks will be prioritized under this rule and will be placed on the yards using the suggested algorithm.
A typical process of such simulation would go through following steps. The first step would be deciding the timeline of deployment. After selecting the timeline target project will be selected. The term project used here is a group of modules and blocks that needs to be placed on the yard. The next step would be choosing the weights for the priority rule. Measures such as delayed time, deployment time, and the size of the block would be considered. By simulating the model while varying the weights of such measures, we will be able to suggest the best performing block selecting policy rule for the spatial lay-out planning. 
번호 category 학회 제목 author presenter year
49 DC  공동학회春  변압기 작업공정의 일정계획을 위한 알고리즘 제안 및 평가 Sungbum Jun    2014 
48 DC  시뮬레이션春  공급사슬에서의 정보 교환을 실현하기 위한 메커니즘에 대한 연구 Sungho Jo    2007 
47 DC  산업공학秋  제조 전략에 따른 supply chain에서의 RFID system 구축 Sungho Jo    2007 
46 DC  공동학회春  RFID를 활용한 업무 프로세스 관리 및 개선 방안 마련에 대한 연구 Sungho Jo    2008 
45 DC  산업공학秋  다수 프로젝트 상황에서 활동의 기한준수확률에 기반한 자원재배분 기법 SungHoon KIM    2010 
44 DC  시뮬레이션秋  재공 재고 요소를 고려한 부하평준화 프로젝트 스케줄링 Sungjin Lee    2012 
43 DC  산업공학秋  조선소 최적 생산을 위한 부하평준화 휴리스틱 개발 Sungjin Lee    2011 
42 DC  공동학회春  개방형 비즈니스 환경에서 주문 수용 수준 최대화를 위한 양방향 협상을 고려한 통합된 공급사슬계획 모델에 관한 연구 Sungjin Lee    2011 
41 IC  ISPIM  Open Innovation in SMEs - The Case of KICMS Sungjoo Lee    2008 
40 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
39 IC  ICPR  Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain file Sungwon Jung    2003 
38 IC  AsiaSim  Vendor Managed Inventory and its value in the various supply chain Sungwon Jung    2004 
37 IC  AsiaSim  Reorder decision system based on the concept of the order risk using neural networks Sungwon Jung    2004 
36 DC  경영과학秋  유전 알고리즘을 이용한 생산 및 분배 계획 Sungwon Jung    2001 
35 DC  산업공학秋  생산용량제약조건을 고려한 공급사슬 상에서의 생산분배 계획 Sungwon Jung    2002 
34 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
33 DC  공동학회春  MRP와 간반을 결합한 혼합시스템의 설계에 관한 연구 Taeyoung Song    2000 
32 IC  ICMA  Machine-Understandable e-Business Modeling with Ontology Tai-Woo Chang    2002 
31 IC  Asian eBiz  A Systematic Approach for Ontology-based e-Business Modeling Tai-Woo Chang    2002 
30 IC  IBERC  An Ontology-Based Framework for e-Business Integration file Tai-Woo Chang    2003 
29 IC  CIE  Information Strategy Planning for the Korean Postal Address Database file Tai-Woo Chang    2004 
28 DC  지능정보秋  온톨로지 기반의 e-비즈니스 통합 프레임워크 Tai-Woo Chang    2002 
27 IC  GECCO  A Study on the Resource Allocation Planning for Automated Container Terminals Yangja Jang    2001 
26 DC  공동학회春  MRP 생산 오더의 페깅 정보 만족과 납기 지연을 최소화하는 다수 기계 작업장들의 스케쥴링에 대한 연구 Yangja Jang    1999 
25 DC  한국SCM春  모델관리시스템을 활용한 공급망 계획시스템 개발에 관한 연구 Yangja Jang    2001 
24 DC  지능정보春  다단계 제품구조를 고려한 유연 Job Shop 일정계획의 Large Step Optimization Yangja Jang    2002 
23 DC  공동학회春  복합 포아송 수요를 갖는 2계층 분배형 공급사슬에서 공유 재고정보를 활용한 재주문 정책 Yongwon S    2001 
22 IC  EURO  Multiperiod Hybrid Manufacturing/Remanufacturing Planning Under the Internet-of-Things Scenario file Young-woo Kim  Young-woo Kim  2015 
21 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
20 DC  공동학회春  유연한 수리계획 작성을 위한 모형관리자의 설계 및 구현 Youngcheol Yang    2001 
19 DC  공동학회春  Supply Chain 최적화 문제의 Model Management System의 설계 및 구현-생산 및 분배계획을 중심으로 Youngcheol Yang    2002 
18 DC  시뮬레이션春  Devs 이용한 북한군 갱도포병 타격에 관한 연구 Youngho Chung    2008 
17 DC  시뮬레이션秋  지상전 작전수립을 위한 Fuzzy-AHP 기반의 의사결정 모델 연구 Youngkyun Lee    2008 
16 DC  시뮬레이션秋  중앙집중형 역방향 물류관리의 효과에 관한 연구 Youngwoo Kim    2009 
15 DC  공동학회春  Design and Operational Planning for Reverse Logistics Using RFID Technologies Youngwoo Kim    2010 
14 DC  경영통합학회  Software Development Effort Estimation Considering Complexity Using Radial Basis Function Network Youngwoo Kim    2010 
13 DC  지속가능春  효율적인 재활용을 위한 무선주파수 인식기술 기반 정보시스템 설계 Youngwoo Kim    2012 
12 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
11 IC  APMS  Designing an Integrated Data System for Remanufacturing with RFID Technology Youngwoo Kim    2012 
10 IC  APMS  A Lifecycle Data Management System Based on RFID Technology of EPCC1G2 Youngwoo Kim    2014 
9 IC  Asian eBiz  Applying Negotiation Patterns in Supply Chain Planning based on Self-integrating Environment file Yuncheol Kang    2005 
8 IC  APMS  A study on Active Information Sharing for Organizing Effective Collaborative Manufacturing Yuncheol Kang    2008 
7 DC  국제SCM  자동통합 환경하에서의 공급사슬계획에서 자동협상 프로세스 모델에 관한 연구 Yuncheol Kang    2003 
6 DC  한국SCM학회  EPCC1G2 표준을 이용한 RFID기반 PEID 시스템 도입 시 기대효과 분석 file 김영우  김영우  2015 
5 DC  시뮬레이션春  태양광 발전 보급 확산을 통한 전력문제 완화에 관한 연구 최상윤    2014 
4 DC  대한산업공학회  태양광 보급 확산을 통한 전력 자립률 제고에 관한 연구: 서울 지역을 중심으로 file 최상윤  최상윤  2015 
3 DC  한국방재학회  사물인터넷을 활용한 재난복구 현장 모니터링 시스템 구축에 관한 연구 file 최상윤  최상윤  2017 
2 DC  한국방재학회  재난 시 돌발 상황 대응 시스템 구축에 관한 연구 file 한수민  최상윤  2016 
1 DJ  공동학회春  재난 현장의 구호 자원 운송 차량 경로에 관한 연구 file 한수민  한수민  2016