author Kim Hyun Jun 
2nd author Jinwoo Park
Sunghoon Kim
Sang Hyup Lee
Seung Jin Ha 
presenter Kim Hyun Jun 
info This conference paper has been presented by Kim Hyun Jun the Asia-Simulation Conference. The conference has been held in Jeju, Korea, Republic of, 2015/11/04 ~ 2014/11/07 . 
year 2015 
category IC 
start / end date 2015-11-04 ~ 2015-11-07 
city / nation Jeju / Korea 
학회 AsiaSim 
keywords Lay-out Planning, Priority Policy, Dynamic Programming, Simulation 
abstract Though numerous studies have dealt the lay-out planning methods for shipbuilding industry, in practice the lay-out planning is still done by people under the rule of thumb. It seems illogical to treat such key resource without any scientific management, however matters such as reliability, frequent modifications, and lack of data makes it hard to adapt an automated method in such spatial planning.
To investigate on this problem this paper examines a heavy industry company in Korea and executes a simulation study. The targeted company produces numerous types of offshore plants which all follows varying production processes. So it is told that there exists some special difficulties in predicting and managing newly given constructions. Also another characteristic that makes managing such work difficult is that there exists frequent change requests to design process, quantity, and schedule.
Like many other competitive companies, company H still relies solely on human resource to plan the lay-outs without using any automated systems. This could cause problems such as long hours spent in planning/evaluating the lay-out plan and the difficulty in attaining a substitute for such planning jobs. This is because the current lay-out planning process depends heavily on the experiences of the planner. The difficulty of training a worker to become such specialist is one thing, but to find a substitute in the case of emergency is a more serious problem.
To solve this problem this paper suggests a practical algorithm that can deploy the blocks under a short given time. The system would automatically prioritize the blocks that needs to be placed on the yards and find a location that could maximize the yard utilization and minimize the delays on the site. However because of the uncertainties in the field, such as assembly modifications, contract date delays, and variations in the processing time, it is extremely difficult to find an optimal solution in such short given time.
Studies done by Li(2005) have divided the lay-out process into two separate steps, prescheduling and spatial planning. Here the second step utilized the genetic algorithm. Other researches such as Raj(2007) treated this problem as a 3D bin packing problem, while Zheng(2011) approached this matter using greedy algorithm to minimize the makespan. However none of the previous works considered the uncertainties that exits on the spatial planning process.
So to aid the suggested problem this simulation study aims to find a priority rule to deploy the blocks while considering the uncertainties. Measures such as block size, delayed time of the selected block, and so on would be examined through simulation to find the best performing weights for such variables. Blocks will be prioritized under this rule and will be placed on the yards using the suggested algorithm.
A typical process of such simulation would go through following steps. The first step would be deciding the timeline of deployment. After selecting the timeline target project will be selected. The term project used here is a group of modules and blocks that needs to be placed on the yard. The next step would be choosing the weights for the priority rule. Measures such as delayed time, deployment time, and the size of the block would be considered. By simulating the model while varying the weights of such measures, we will be able to suggest the best performing block selecting policy rule for the spatial lay-out planning. 
번호 category 학회 제목 author presenter year
154 DC  한국방재학회  재난 시 돌발 상황 대응 시스템 구축에 관한 연구 file 한수민  최상윤  2016 
153 DC  한국방재학회  사물인터넷을 활용한 재난복구 현장 모니터링 시스템 구축에 관한 연구 file 최상윤  최상윤  2017 
152 DC  한국SCM학회  EPCC1G2 표준을 이용한 RFID기반 PEID 시스템 도입 시 기대효과 분석 file 김영우  김영우  2015 
151 DC  한국SCM春  공급사슬시스템에서의 분산 생산 및 분배 계획의 통합 Muynghee Byun    2000 
150 DC  한국SCM春  SC Network Design Considering Multi-level, Multi-product, Capacitated Facility Eoksu Sim    2000 
149 DC  한국SCM春  컴포넌트에 기반한 공급사슬 계획 시스템 개발 Kichang Lee    2000 
148 DC  한국SCM春  판촉비용과 주문비용 감소효과의 분배자 이익에 미치는 영향 분석 Jaehoon Seoung    2001 
147 DC  한국SCM春  모델관리시스템을 활용한 공급망 계획시스템 개발에 관한 연구 Yangja Jang    2001 
146 DC  한국SCM春  자동차부품의 역공급사슬 구성에 관한 연구 Haejoong Kim    2004 
145 DC  한국SCM  RFID 기술을 활용한 공급 사슬의 성과 측정 프레임워크에 관한 연구 Jangwon Cho    2006 
144 DC  한국SCM  한국의 국제 복합 일관 수송 현황과 개선방안_ 3PL 철도 화물을 중심으로 Jungjoon Park    2009 
143 DC  한국SCM  지속적인 개선을 위한 제조성과 평가방법론 개발 연구 Gyusun Hwang    2014 
142 DC  한국SCM  역공급사슬 구현을 위한 Reference Model 개발 및 전략적 RoadMap에 관한 연구 Chihoon Lim    2005 
141 DC  지속가능春  효율적인 재활용을 위한 무선주파수 인식기술 기반 정보시스템 설계 Youngwoo Kim    2012 
140 DC  지능정보秋  온톨로지 기반의 e-비즈니스 통합 프레임워크 Tai-Woo Chang    2002 
139 DC  지능정보春  다단계 제품구조를 고려한 유연 Job Shop 일정계획의 Large Step Optimization Yangja Jang    2002 
138 DC  정보과학秋  Database Technology for Computer Integrated Manufuacturing Jusuk Park    1992 
137 DC  정밀공학  트리 구조의 BOM에 기초한 고성능 MRP 시스템 Hongbum Na    2006 
136 DC  정밀공학  산업별 특징에 따른 스케줄링 소프트웨어 개발에 관한 연구 Hongbum Na    2008 
135 DC  정밀공학  제조공정의 특징에 따른 우선순위 규칙 기반의 스케줄링 방법 Hongbum Na    2009