author Kim Hyun Jun 
2nd author Jinwoo Park
Sunghoon Kim
Sang Hyup Lee
Seung Jin Ha 
presenter Kim Hyun Jun 
info This conference paper has been presented by Kim Hyun Jun the Asia-Simulation Conference. The conference has been held in Jeju, Korea, Republic of, 2015/11/04 ~ 2014/11/07 . 
year 2015 
category IC 
start / end date 2015-11-04 ~ 2015-11-07 
city / nation Jeju / Korea 
학회 AsiaSim 
keywords Lay-out Planning, Priority Policy, Dynamic Programming, Simulation 
abstract Though numerous studies have dealt the lay-out planning methods for shipbuilding industry, in practice the lay-out planning is still done by people under the rule of thumb. It seems illogical to treat such key resource without any scientific management, however matters such as reliability, frequent modifications, and lack of data makes it hard to adapt an automated method in such spatial planning.
To investigate on this problem this paper examines a heavy industry company in Korea and executes a simulation study. The targeted company produces numerous types of offshore plants which all follows varying production processes. So it is told that there exists some special difficulties in predicting and managing newly given constructions. Also another characteristic that makes managing such work difficult is that there exists frequent change requests to design process, quantity, and schedule.
Like many other competitive companies, company H still relies solely on human resource to plan the lay-outs without using any automated systems. This could cause problems such as long hours spent in planning/evaluating the lay-out plan and the difficulty in attaining a substitute for such planning jobs. This is because the current lay-out planning process depends heavily on the experiences of the planner. The difficulty of training a worker to become such specialist is one thing, but to find a substitute in the case of emergency is a more serious problem.
To solve this problem this paper suggests a practical algorithm that can deploy the blocks under a short given time. The system would automatically prioritize the blocks that needs to be placed on the yards and find a location that could maximize the yard utilization and minimize the delays on the site. However because of the uncertainties in the field, such as assembly modifications, contract date delays, and variations in the processing time, it is extremely difficult to find an optimal solution in such short given time.
Studies done by Li(2005) have divided the lay-out process into two separate steps, prescheduling and spatial planning. Here the second step utilized the genetic algorithm. Other researches such as Raj(2007) treated this problem as a 3D bin packing problem, while Zheng(2011) approached this matter using greedy algorithm to minimize the makespan. However none of the previous works considered the uncertainties that exits on the spatial planning process.
So to aid the suggested problem this simulation study aims to find a priority rule to deploy the blocks while considering the uncertainties. Measures such as block size, delayed time of the selected block, and so on would be examined through simulation to find the best performing weights for such variables. Blocks will be prioritized under this rule and will be placed on the yards using the suggested algorithm.
A typical process of such simulation would go through following steps. The first step would be deciding the timeline of deployment. After selecting the timeline target project will be selected. The term project used here is a group of modules and blocks that needs to be placed on the yard. The next step would be choosing the weights for the priority rule. Measures such as delayed time, deployment time, and the size of the block would be considered. By simulating the model while varying the weights of such measures, we will be able to suggest the best performing block selecting policy rule for the spatial lay-out planning. 
번호 category 학회 제목 author presenter year
49 IC  ICOIN  Analysis of Paris Metro Pricing for Wireless Internet Services Dongmyung Lee    2011 
48 IC  GameNets  Paris Metro Pricing for Internet Service Differentiation Dongmyung Lee    2011 
47 IC  ICQT  A Token Pricing Scheme for Internet Services Dongmyung Lee    2011 
46 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
45 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
44 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
43 IC  APMS  Modeling and optimization of unrelated parallel machine scheduling problem with time-dependent and machine-dependent electricity cost Joon Yung Moon    2011 
42 IC  AsiaSim  Developing a Practical Machine Scheduler for Worker-Involved Reconfigurable Manufacturing Systems Jinwu Seo    2011 
41 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
40 IC  ICICIC  Evaluation of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
39 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
38 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
37 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
36 IC  IEOM  Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop Sumin Han    2012 
35 IC  APMS  Designing an Integrated Data System for Remanufacturing with RFID Technology Youngwoo Kim    2012 
34 IC  APMS  Development of a Strategic Model for Freight Transportation with a Case Study of the Far East Louis Coulet    2013 
33 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
32 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
31 IC  APMS  A Lifecycle Data Management System Based on RFID Technology of EPCC1G2 Youngwoo Kim    2014 
30 DC  공동학회春  MRP와 간반을 결합한 혼합시스템의 설계에 관한 연구 Taeyoung Song    2000 
29 DC  산업공학秋  분산객체와 XML 기반의 생산관리 컴포넌트 개발에 관한 연구 Daiki Min    2000 
28 DC  한국SCM春  공급사슬시스템에서의 분산 생산 및 분배 계획의 통합 Muynghee Byun    2000 
27 DC  한국SCM春  SC Network Design Considering Multi-level, Multi-product, Capacitated Facility Eoksu Sim    2000 
26 DC  한국SCM春  컴포넌트에 기반한 공급사슬 계획 시스템 개발 Kichang Lee    2000 
25 DC  공동학회春  복합 포아송 수요를 갖는 2계층 분배형 공급사슬에서 공유 재고정보를 활용한 재주문 정책 Yongwon S    2001 
24 DC  공동학회春  셀 제조시스템 구현을 위한 의사결정지원에 관한 연구 Muynghee Byun    2001 
23 DC  공동학회春  유연한 수리계획 작성을 위한 모형관리자의 설계 및 구현 Youngcheol Yang    2001 
22 DC  공동학회春  주문비용 감축과 판촉에 대한 투자 의사결정에 대한 연구 Jaehoon Seoung    2001 
21 DC  한국SCM春  판촉비용과 주문비용 감소효과의 분배자 이익에 미치는 영향 분석 Jaehoon Seoung    2001 
20 DC  한국SCM春  모델관리시스템을 활용한 공급망 계획시스템 개발에 관한 연구 Yangja Jang    2001 
19 DC  경영과학秋  유전 알고리즘을 이용한 생산 및 분배 계획 Sungwon Jung    2001 
18 DC  공동학회春  Supply Chain 최적화 문제의 Model Management System의 설계 및 구현-생산 및 분배계획을 중심으로 Youngcheol Yang    2002 
17 DC  공동학회春  BSC와 DEA기법을 이용한 조직 성과 비교에 대한 연구 Kitae Shin    2002 
16 DC  지능정보春  다단계 제품구조를 고려한 유연 Job Shop 일정계획의 Large Step Optimization Yangja Jang    2002 
15 DC  경영과학秋  LP-Relaxation과 유전 알고리즘을 이용한 공급사슬설계 문제 Haejoong Kim    2002 
14 DC  산업공학秋  생산용량제약조건을 고려한 공급사슬 상에서의 생산분배 계획 Sungwon Jung    2002 
13 DC  지능정보秋  온톨로지 기반의 e-비즈니스 통합 프레임워크 Tai-Woo Chang    2002 
12 DC  공동학회春  QFD와 인공지능기법을 이용한 사출금형의 견적 지원 시스템 Gunhee Kim    2003 
11 DC  산업공학秋  페트리넷과 대기행렬을 활용한 제조시스템의 수행도 최적화 방안 Kichang Lee    2003 
10 DC  국제SCM  자동통합 환경하에서의 공급사슬계획에서 자동협상 프로세스 모델에 관한 연구 Yuncheol Kang    2003 
9 DC  정밀공학  컴퓨터 비전기술을 이용한 작업측정방법의 개선과 ERP 응용에 관한 연구 Hyoung-Gon Lee    2004 
8 DC  산업공학秋  트래픽 예측을 통한 쇼핑몰 사이트의 시스템 사이징 방법 Jungjoon Park    2004 
7 DC  공동학회春  자동차부품의 재활용률 증대를 위한 역공급사슬에 관한 연구 Haejoong Kim    2004 
6 DC  한국SCM春  자동차부품의 역공급사슬 구성에 관한 연구 Haejoong Kim    2004 
5 DC  시뮬레이션秋  시스템 다이내믹스를 이용한 자동차 역공급사슬의 정량적 분석 Dongjoon Lim    2005 
4 DC  공동학회春  역공급사슬환경에서의 제품 개발 방법론에 대한 연구 Joon Kim    2005 
3 DC  공동학회春  활동기준 원가를 고려한 확장 워크플로우모델 Moontae Hwang    2005 
2 DC  정밀공학  ERP 환경에서 MRP 부품전개의 속도향상에 관한 연구 Hyoung-Gon Lee    2005 
1 DC  산업공학秋  RFID와 Web Services 기술을 이용한 Ubiquitous MES 프레임워크 Manchul Han    2005