author Mokmin Park 
2nd author Kitae Shin
Hanil Jeong
Jinwoo Park 
presenter  
info This conference paper has been presented by Jinwoo Park on the International Conference on Advances in Production Management Systems. The conference has been held in Bordeaux, France, 2009/9/19 ~ 2009/9/23 . 
year 2009 
category IC 
start / end date  
city / nation  
학회 APMS 
keywords responsiveness; due-date assignment; web services technology; ubiquitous computing technology 
abstract This study attempts to enhance the responsiveness of enterprises by adjusting the delivery dates taking into account of the production and delivery schedules in a supply chain. To enhance responsiveness, we suggest a due-date assignment method and re-negotiation process for a sales order processing system. The due-date assignment method is designed with the concept of categorized customers’ priorities and the re-negotiation process is designed with the concept of the partial delivery and due-date delay allowances. Usually, the due-dates have been considered as customer-assigned exogenous parameters or fixed endogenous variables set by manufacturers. However, those are customary in some industries, e.g. semi-conductor manufacturing, that customers often request changes for their delivery dates after placing an order if something unexpected happens. From these observations, we also propose a new
architecture of responsive sales order processing system based on Web Services and Ubiquitous Computing technologies for reliable real-time information. 

Download :

번호 category 학회 제목 author presenter year
95 IC  ICIMSA  Internet of Things-Enabled Supply Chain Performance Measurement Model file Abdallah J. Dweekat  Abdallah J. Dweekat  2016 
94 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
93 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
92 IC  APIEMS  A study on relieving electric power shortage by on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2014 
91 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
90 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
89 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
88 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
87 IC  ICOIN  Analysis of Paris Metro Pricing for Wireless Internet Services Dongmyung Lee    2011 
86 IC  GameNets  Paris Metro Pricing for Internet Service Differentiation Dongmyung Lee    2011 
85 IC  ICQT  A Token Pricing Scheme for Internet Services Dongmyung Lee    2011 
84 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
83 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
82 IC  GECCO  A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm file Eoksu Sim    2004 
81 IC  AsiaSim  Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling file Eoksu Sim    2004 
80 IC  Asian eBiz  Integration of RFID and Web Services Technology in MES Gunnam Ong    2007 
79 IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
78 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
77 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
76 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016