author Seunghyun Yoon 
2nd author / Kichang Lee (Dept. of Industrial Engineering, Seoul National University)
/ Chankwon Park (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 06월 18일 ~ 2000년 06월 21일
City: Seoul
Nation: Korea
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 INFORMS-KORMS 
keywords MRP, Capacity Constraint, Dynamic Lead Time, Event-driven, Object-oriented 
abstract The traditional descriptions of MRP system almost always assume time buckets, fixed lead time, and infinite capacity. This research presents new MRP method considering capacity constraints and dynamic lead time. This method uses event-driven approach, which schedules all the operations of a job to finite capacity when an order is entered. It also uses BOMfr(Bill of Manufacture) to integrate BOM, routing, capacity and current order status. For each machine's detailed schedule, JOS(Job oriented scheduling) is used. The prototype system has been developed with COM. Data model is represented with UML(Unified Modeling Language). The system consists of MRP LOGIC COM for the MRP system's logic and MRP DB COM for persistent data storage. The modules developed with COM component show higher reusability and maintainability than traditional object-oriented system. 

Download:

번호 category 학회 제목 author presenter year
15 IC  AsiaSim  Vendor Managed Inventory and its value in the various supply chain Sungwon Jung    2004 
14 IC  AsiaSim  Reorder decision system based on the concept of the order risk using neural networks Sungwon Jung    2004 
13 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
12 IC  ICMA  Machine-Understandable e-Business Modeling with Ontology Tai-Woo Chang    2002 
11 IC  Asian eBiz  A Systematic Approach for Ontology-based e-Business Modeling Tai-Woo Chang    2002 
10 IC  IBERC  An Ontology-Based Framework for e-Business Integration file Tai-Woo Chang    2003 
9 IC  CIE  Information Strategy Planning for the Korean Postal Address Database file Tai-Woo Chang    2004 
8 IC  GECCO  A Study on the Resource Allocation Planning for Automated Container Terminals Yangja Jang    2001 
7 IC  EURO  Multiperiod Hybrid Manufacturing/Remanufacturing Planning Under the Internet-of-Things Scenario file Young-woo Kim  Young-woo Kim  2015 
6 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
5 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
4 IC  APMS  Designing an Integrated Data System for Remanufacturing with RFID Technology Youngwoo Kim    2012 
3 IC  APMS  A Lifecycle Data Management System Based on RFID Technology of EPCC1G2 Youngwoo Kim    2014 
2 IC  Asian eBiz  Applying Negotiation Patterns in Supply Chain Planning based on Self-integrating Environment file Yuncheol Kang    2005 
1 IC  APMS  A study on Active Information Sharing for Organizing Effective Collaborative Manufacturing Yuncheol Kang    2008