author Hongbum Na 
2nd author Dongmyung Lee
Jinwu Seo
Jinwoo Park 
presenter  
info This conference paper has been presented by Hongbum Na on the International Conference on Production Research. The conference has been held in Shanghai, China, 2009/8/2 ~ 2009/8/6 .

Additional information about the conference(conference paper) is 'New World Mayfair Hotel, shanghai'. 
year 2009 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Index-based scheduling, Scheduling index, Multi-objectives, Priority rule based scheduling. 
abstract In this paper, we propose a new scheduling method based on Farsighted Index-based Scheduling (FIS) method which may be useful for manufacturing industries of high complexity. We group manufacturing processes into small groups so that the complexity is reduced. There are two steps in FIS method: index generation step and priority rule based scheduling step. In the first step, numerical indices related to characteristics of product, manufacturing system, production resources and costs are generated and used to define objective functions of scheduling problems. After objective functions are set, priority rule based scheduling methods are applied. These methods consist of combination of traditional dispatching rules and new priority rules according to several indices. To show the performance of the method, scheduling results are compared with job dispatching methods with traditional scheduling objective functions. 

Download :

번호 category 학회 제목 author presenter year
35 IC  ICPR  On-Site Safety Education in Factories Using Augmented Reality with Text Mining-based Marker file Philjun Moon  Philjun Moon  2017 
34 IC  ICQT  A Token Pricing Scheme for Internet Services Dongmyung Lee    2011 
33 IC  ICRA  An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State file Kitae Kim    2001 
32 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
31 IC  IEOM  A Real-time Information System Using RFID for Visually Impaired Kyounghwi Tae    2011 
30 IC  IEOM  Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop Sumin Han    2012 
29 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
28 IC  IFAC on IMS  A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment Kidong Kim    1997 
27 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
26 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
25 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016 
24 IC  INFORMS  A Study on emergency logistics problem after massive natural disaster Sumin Han  Sumin Han  2014 
23 IC  INFORMS-KORMS  Hybrid Algorithms in Integrated Quality Design & Scheduling Jonghan Kim    2000 
22 IC  INFORMS-KORMS  Development of capacitated event-driven MRP components using object oriented method Seunghyun Yoon    2000 
21 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
20 IC  ISFA  A framework for the ubiquitous MES using RFID and Web services technology file Manchul Han    2006 
19 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
18 IC  ISPIM  Open Innovation in SMEs - The Case of KICMS Sungjoo Lee    2008 
17 IC  IW on IMS  Maximally permissive adaptive control of an automated manufacturing cell Sangkyun Kim    1999 
16 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014