author Young-woo Kim 
2nd author Jinwoo Park 
presenter Young-woo Kim 
info 27th European Conference on Operational Research 
year 2015 
category IC 
start / end date 2015.07.10 ~ 2015.07.13 
city / nation Glasgow, Scotland 
학회 EURO 
keywords Production Planning, Internet-of-Things, Closed-loop Supply Chain Management, Industrial Ecology 
abstract Efficient operation of a closed-loop supply chain should be supported by reasonably good forward and reverse processes. However there exists the chronic problem of uncertainty about returned end of life (EOL) products with regard to timing, quality and quantity, which hin-ders the efficient operation of closed-loop supply chain. In this study, we present a frame-work of lifecycle data management system which gathers data of products and components under the Internet-of-Things (IoT) scenario. The proposed system enables information sharing among all entities in the supply chain and enables us to grasp the actual condition of the re-turned products with good accuracy. Thereby the proposed system helps us to improve the process for disassembly and product disposition to minimize cost of the total system. First, we develop a mathematical model of a closed-loop supply chain within the IoT-based infor-mation sharing environment consisting of a supplier, a manufacturer, and a reprocessing facili-ty in 3 different markets, namely original, refurbish and spare parts. Next we address a multi-period production planning model for multiple products consisting of multiple components with the objective of minimizing the sum of all incurred costs from the standpoint of a manu-facturer. We also analyze the behavioral characteristics of the model and conduct experiments to justify the proposed scheme. 

.

번호 category 학회 제목 author presenter year
15 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
14 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
13 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
12 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
11 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
10 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
9 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
8 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
7 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
6 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
5 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
4 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
3 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
2 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
1 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012