author Daeyoung Chung 
2nd author / Kichang Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 08월 02일 ~ 2000년 08월 04일
City: Bangkok
Nation: Thailand
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Job Shop, Scheduling, Due Date 
abstract We consider a kind of job shop scheduling problem where each job has its due date. Temporal adjustment of machine capacities is possible through outsourcing with subcontractors when the due dates cannot be kept. In practice, outsourcing of operations is not rare in many types of manufacturing industries. e.g. machining, printing, etc. And practice of outsourcing will increase in accordance, with the emerging new manufacturing paradigms, such as virtual or holonic manufacturing. We present a heuristic solution procedure that addresses the total job-shop scheduling problem by solving a series of smaller sub-problems to optimality. For the sake of efficiency,the algorithm repeatedly executes in two steps on bottleneck machines-(1)improving the sequence of operations and (2) picking out the operations to be subcontracted. Experimental results prove that the suggested algorithm outperforms traditional methods. 

Download:

번호 category 학회 제목 author presenter year
15 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
14 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
13 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
12 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
11 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
10 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
9 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
8 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
7 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
6 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
5 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
4 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
3 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
2 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
1 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012