author Daeyoung Chung 
2nd author / Kichang Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 08월 02일 ~ 2000년 08월 04일
City: Bangkok
Nation: Thailand
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Job Shop, Scheduling, Due Date 
abstract We consider a kind of job shop scheduling problem where each job has its due date. Temporal adjustment of machine capacities is possible through outsourcing with subcontractors when the due dates cannot be kept. In practice, outsourcing of operations is not rare in many types of manufacturing industries. e.g. machining, printing, etc. And practice of outsourcing will increase in accordance, with the emerging new manufacturing paradigms, such as virtual or holonic manufacturing. We present a heuristic solution procedure that addresses the total job-shop scheduling problem by solving a series of smaller sub-problems to optimality. For the sake of efficiency,the algorithm repeatedly executes in two steps on bottleneck machines-(1)improving the sequence of operations and (2) picking out the operations to be subcontracted. Experimental results prove that the suggested algorithm outperforms traditional methods. 

Download:

번호 category 학회 제목 author presenter year
15 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
14 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
13 IC  APMS  Modeling and optimization of unrelated parallel machine scheduling problem with time-dependent and machine-dependent electricity cost Joon Yung Moon    2011 
12 IC  AsiaSim  Developing a Practical Machine Scheduler for Worker-Involved Reconfigurable Manufacturing Systems Jinwu Seo    2011 
11 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
10 IC  ICICIC  Evaluation of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
9 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
8 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
7 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
6 IC  IEOM  Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop Sumin Han    2012 
5 IC  APMS  Designing an Integrated Data System for Remanufacturing with RFID Technology Youngwoo Kim    2012 
4 IC  APMS  Development of a Strategic Model for Freight Transportation with a Case Study of the Far East Louis Coulet    2013 
3 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
2 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
1 IC  APMS  A Lifecycle Data Management System Based on RFID Technology of EPCC1G2 Youngwoo Kim    2014