author Daeyoung Chung 
2nd author / Kichang Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 08월 02일 ~ 2000년 08월 04일
City: Bangkok
Nation: Thailand
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Job Shop, Scheduling, Due Date 
abstract We consider a kind of job shop scheduling problem where each job has its due date. Temporal adjustment of machine capacities is possible through outsourcing with subcontractors when the due dates cannot be kept. In practice, outsourcing of operations is not rare in many types of manufacturing industries. e.g. machining, printing, etc. And practice of outsourcing will increase in accordance, with the emerging new manufacturing paradigms, such as virtual or holonic manufacturing. We present a heuristic solution procedure that addresses the total job-shop scheduling problem by solving a series of smaller sub-problems to optimality. For the sake of efficiency,the algorithm repeatedly executes in two steps on bottleneck machines-(1)improving the sequence of operations and (2) picking out the operations to be subcontracted. Experimental results prove that the suggested algorithm outperforms traditional methods. 

Download:

번호 category 학회 제목 author presenter year
15 IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
14 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
13 IC  EURO  Multiperiod Hybrid Manufacturing/Remanufacturing Planning Under the Internet-of-Things Scenario file Young-woo Kim  Young-woo Kim  2015 
12 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
11 IC  AsiaSim  A Study on Simulation Model for Yard Layout Planning in Offshore Plant Industry file Kim Hyun Jun  Kim Hyun Jun  2015 
10 IC  ICAT  A study on RFID user memory applications for production management and scheduling file Kyoungmin Kim  Kyoungmin Kim  2015 
9 IC  APORS  A study on makeshift recovery planning in emergency logistics considering disaster scene's risks and uncertainties file Sumin Han  Sumin Han  2015 
8 IC  ICIMSA  Internet of Things-Enabled Supply Chain Performance Measurement Model file Abdallah J. Dweekat  Abdallah J. Dweekat  2016 
7 IC  FAIM 2016  A Study on the Distributed Vehicle Routing Problem of emergency vehicle fleet in the Disaster Scene file Sumin Han  Sumin Han  2016 
6 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016 
5 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
4 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
3 IC  ICDMCE  Study on smart disaster recovery system using Internet of Things file Sumin Han  Gyusun Hwang  2016 
2 IC  ICPR  On-Site Safety Education in Factories Using Augmented Reality with Text Mining-based Marker file Philjun Moon  Philjun Moon  2017 
1 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017