183 |
~2010
RFID-enable real-time wireless manufacturing
|
홍영지 |
182 |
~2010
제조 기업의 판매주문관리에서의 대응성 향상 방안
|
박목민 |
181 |
~2010
A genetic algorithm based approach for the periodic vehicle routing problem
|
문준영 |
180 |
~2010
한국의 국제 복합 일관 수송 현황과 개선방안_ 3PL 철도 화물을 중심으로
|
박정호 |
179 |
~2010
Scheduling in Assembly Jobshop
|
서진우 |
178 |
~2010
Single Machine Scheduling Problems with Family Setups
|
이동명 |
177 |
~2010
Reconfigurable manufacturing systems the state of the art
|
박정호 |
176 |
~2010
Flexible VRP in Reverse Logistics
|
김영우 |
175 |
~2010
e-Maintenance Service in Product Lifecycle Information Management
|
윤소연 |
174 |
~2010
Business Integration Framework for Due-date Re-negotiation in Responsive Sales Order Processing System (논문준비)
|
박목민 |
173 |
~2010
Order stability in supply chains
|
홍영지 |
172 |
~2010
Gauge-changeable system for the Northeast Asian Railway Network
|
박정준 |
171 |
~2010
Vehicle routing problem with stochastic demands
|
문치호 |
170 |
~2010
Theory Of Constraints
|
서진우 |
169 |
~2010
Computer-aided Reconfiguration Planning
|
이동명 |
168 |
~2010
A NEW SCHEDULING PARADIGM BASED ON FARSIGHTED INDEX (ICPR 2009)
|
나홍범 |
167 |
~2010
A Framework for e-Maintenance Service System in the Product Life Cycle
|
윤소연 |
166 |
~2010
Design of Closed-loop Supply Chain
|
김영우 |
165 |
~2010
Multiple-objective scheduling and real-time dispatching
|
문치호 |
164 |
~2010
FMS Real-time scheduling Method
|
박정호 |