206 |
~2010
How to reschedule - 논문 아이디어 (비공개)
|
서진우 |
205 |
~2010
Implementation and testing of an EPCglobal-aware Discovery Service for Item-level Traceability
|
홍영지 |
204 |
~2010
스케줄링에서 변동예측 기술의 활용
|
서진우 |
203 |
~2010
Scheduling Problems in an FMS with One Vehicle
|
이동명 |
202 |
~2010
Software Productivity: research survey
|
서진우 |
201 |
~2010
Intelligent Product
|
윤소연 |
200 |
2011
RFID in product lifecycle management : a case in the automotive industry
|
박준호 |
199 |
~2010
Structuring Method for Ambient Intelligence
|
김성훈 |
198 |
~2010
Software Metric & Productivity Measurement
|
한수민 |
197 |
~2010
Evaluating logistics network configuration for a global SC
|
Louis |
196 |
~2010
A NOVEL RFID-BASED SHIPPING CONTAINERS LOCATION AND IDENTIFICATION
|
태경휘 |
195 |
~2010
Software Productivity and Its Prediction
|
김영우 |
194 |
~2010
An integrated dispatching rule for wafer fabrication
|
문치호 |
193 |
~2010
RFID application
|
홍영지 |
192 |
~2010
RMC Scheduling
|
서진우 |
191 |
~2010
A farsighted index scheduling method for flexible job shop environment with multi-level product structure
|
나홍범 |
190 |
~2010
Collaborative Agent based Supply Chain Planning
|
이동명 |
189 |
~2010
Scheduling trains as a blocking parallel-machine job shop scheduling problem
|
박정준 |
188 |
~2010
e-Maintenance Framework & Customer-facing diffusion model with RFID
|
윤소연 |
187 |
~2010
RFID-based Reverse Logistics System
|
김영우 |
186 |
~2010
RFID benefits,costs,and possibilities:The economic alanalysis of RFID deployment in a cruise corporation global service supply chain
|
태경휘 |
185 |
~2010
Floating stocks in fast moving consumer goods
|
Louis |
184 |
~2010
Dispatching rules for job shop scheduling with due date-based objectives
|
문치호 |
183 |
~2010
RFID-enable real-time wireless manufacturing
|
홍영지 |
» |
~2010
제조 기업의 판매주문관리에서의 대응성 향상 방안
|
박목민 |
181 |
~2010
A genetic algorithm based approach for the periodic vehicle routing problem
|
문준영 |
180 |
~2010
한국의 국제 복합 일관 수송 현황과 개선방안_ 3PL 철도 화물을 중심으로
|
박정호 |
179 |
~2010
Scheduling in Assembly Jobshop
|
서진우 |
178 |
~2010
Single Machine Scheduling Problems with Family Setups
|
이동명 |
177 |
~2010
Reconfigurable manufacturing systems the state of the art
|
박정호 |
176 |
~2010
Flexible VRP in Reverse Logistics
|
김영우 |
175 |
~2010
e-Maintenance Service in Product Lifecycle Information Management
|
윤소연 |
174 |
~2010
Business Integration Framework for Due-date Re-negotiation in Responsive Sales Order Processing System (논문준비)
|
박목민 |
173 |
~2010
Order stability in supply chains
|
홍영지 |
172 |
~2010
Gauge-changeable system for the Northeast Asian Railway Network
|
박정준 |
171 |
~2010
Vehicle routing problem with stochastic demands
|
문치호 |
170 |
~2010
Theory Of Constraints
|
서진우 |
169 |
~2010
Computer-aided Reconfiguration Planning
|
이동명 |
168 |
~2010
A NEW SCHEDULING PARADIGM BASED ON FARSIGHTED INDEX (ICPR 2009)
|
나홍범 |
167 |
~2010
A Framework for e-Maintenance Service System in the Product Life Cycle
|
윤소연 |