246 |
2011
empowerment scheduling for field workforce
|
한수민 |
245 |
2011
Developing Practical Machine Scheduler(비공개)
|
서진우 |
244 |
2011
The algorithm for resource leveling
|
김성훈 |
243 |
2011
프로젝트 제안 PPT
|
황규선 |
242 |
2011
Flight and Maintenance Planning of Military Aircraft
|
박준호 |
241 |
2011
topics related to VRP
|
한수민 |
240 |
2011
Vehicle Routing Problem
|
이성진 |
239 |
2011
Operational and environmental performence measures in CLSC
|
이재봉 |
238 |
2011
Load Leveling in shipyard(비공개)
|
서진우 |
237 |
2011
Centralized Fleet Management System for Automated Transportation System
|
김영우 |
236 |
2011
Resource leveling problem
|
김성훈 |
235 |
2011
Object Process Methodology for Manufacturing Execution System based on International Standard
|
황규선 |
234 |
2011
Lean-pull strategy in a re-entrant manufacturing environment
|
이재봉 |
233 |
2011
Flight and Maintenance Planning of Military Aircraft
|
박준호 |
232 |
2011
A modeling framework for facility location problem
|
김정훈 |
231 |
2011
My research direction in project scheduling
|
김성훈 |
» |
2011
A study on the number of Pallets in RMC
|
한수민 |
229 |
2011
Legislation Analysis for Closed-loop Supply Network
|
김영우 |
228 |
2011
A CSP-based Load Leveling Algorithm for Ship Block Erection Network
|
황규선 |
227 |
2011
Scheduling preventive maintenance for aircraft engine
|
박준호 |
226 |
2011
Project selection and scheduling with completion time dependent returns
|
김성훈 |
225 |
2011
A Model for Coordinated Closed-loop Supply Chain
|
김영우 |
224 |
~2010
think about thesis
|
태경휘 |
223 |
~2010
Power-aware scheduling for makespan and flow
|
이성진 |
222 |
~2010
Assessing environmental performance by combining life cycle assessment, multi-criteria analysis and environmental performance indicators
|
Louis |
221 |
~2010
Multi-dimensional Knapsack Problem using GA
|
서진우 |
220 |
~2010
Aircraft availability Scheduling preventive maintenance Sorties Allocation OR in military
|
박준호 |
219 |
~2010
Smart Grid: Energy Consumption Scheduling & Real-time Pricing
|
이동명 |
218 |
~2010
simulation framework for small scale engagement
|
김정훈 |
217 |
~2010
Resource reallocation techniques considering probability of compliance in multi-project management
|
김성훈 |
216 |
~2010
Function Point & Software effort estimation
|
한수민 |
215 |
~2010
2010 Software Costing Standard
|
김영우 |
214 |
~2010
Smart grid + EPCglobal network
|
태경휘 |
213 |
~2010
Joint Optimisation of Spare Part Inventory, Maintenance Frequency and Repair Capacity for k-out-of-N Systems
|
박준호 |
212 |
~2010
Lean development & SPI-LEAM
|
한수민 |
211 |
~2010
Resource-constrained multi-project scheduling
|
김성훈 |
210 |
~2010
Software Development Effort Estimation Considering Complexity using Radial Basis Function Network(working paper)
|
김영우 |
209 |
~2010
Product-Service System & 논문 아이디어 (비공개)
|
윤소연 |
208 |
~2010
competitive advantage of RFID in SCM
|
태경휘 |
207 |
~2010
Optimization of Ship Design within an Integrated Multimodal Transport System
|
Louis |