로그인
한국어
English
Home
About
-
About MAI LAB
-
SNUGANTT
-
영상처리를 이용한 작업측정 시스템
Lecture
-
Scientific Management
-
CIMS
-
ERP
-
Scheduling
Research
-
Research Area
-
Lab Seminar
-
Publications
Journal
Conference
-
Thesis
-
Project
-
Lab. Sem. Archive
-
ERP
Members
-
Professor
-
Alumni
-
Lab. Members
Gallery
Contact Us
LOGIN
로그인 유지
로그인
한국어
- English
검색
Home
About
About MAI LAB
SNUGANTT
영상처리를 이용한 작업측정 시스템
Lecture
Scientific Management
CIMS
ERP
Scheduling
Research
Research Area
Lab Seminar
Publications
Journal
Conference
Thesis
Project
Lab. Sem. Archive
ERP
Members
Professor
Alumni
Lab. Members
Gallery
Contact Us
Research
Home
/
Research
/
Lab. Sem. Archive
CATEGORY
Research Area
Lab Seminar
Publications
Thesis
Project
Lab. Sem. Archive
ERP
lab sem test
글 수
326
Classic Style
Zine Style
Gallery Style
공정재고를 고려한 선박 생산 스케줄링에 관한 연구
2012
조회 수
51510
추천 수
0
2015.08.03 16:57:19
ultra_admin
*.46.95.150
http://mailab.snu.ac.kr/index.php?document_srl=3398
Date :
2012/04/25
작성인 :
이성진
Key Words :
WIP Inventory, Heuristic Algorithm, Load Leveling, Project Management
Download:
20120502_LSJ.pptx
이 게시물을
첨부 (1)
20120502_LSJ.pptx
[File Size:1.15MB/Download:0]
엮인글 :
http://mailab.snu.ac.kr/index.php?mid=board_XSUi70&document_srl=3398&act=trackback&key=c45
목록
List of Articles
번호
분류
~2010 (223)
2011 (27)
2012 (29)
2013 (21)
2014 (18)
2015 (7)
2017 (1)
Go
제목
작성인
286
2013
자기소개 및 연구계획
이정철
285
2013
조선 프로젝트 계약 방식에 착안한 SW 프로젝트 계약 방식 제안
서진우
284
2013
A hybrid genetic-immune algorithm with improved lifespan and elite antigen for flow-shop scheduling problems
전성범
283
2013
Column generation overview, crew scheduling
김동현
282
2013
조선 프로젝트 계약 방식에 착안한 SW 프로젝트 계약 방식 제안
서진우
281
2013
현대중공업 중일정계획 프로젝트 진행상황 보고
황규선
280
2013
Application of Petri Nets and a Genetic Algorithm to Multi-Mode Multi-Resource Constrained Project Scheduling
전성범
279
2012
Scheduling in a semiconductor packagine line + transformer process
김동현
278
2012
Reconfigurable Mfg. Cell:Algotirhm&performance
서진우
277
2012
석사 졸업 논문 발표
황규선
276
2012
재공 재고 요소를 고려한 부하평준화 스케줄링
김한국
275
2012
Emergency Logistics with Agent-based modeling
한수민
274
2012
Integration of renewable energy
김동현
273
2012
졸업 논문 계획 발표
황규선
272
2012
Reconfigurable Manufacturing Cell : Import Justification
서진우
271
2012
ANP analysis for selecting a green technology
전성범
270
2012
Network Neutrality: Overview and Research Models
이동명
269
2012
Smart grid : vehicle-to-grid
김동현
268
2012
Emergency logistics planning with time variant objective function
한수민
267
2012
Developing performance measurement system for Manufacturing Execution System (MES)
황규선
266
2012
Developing a Production Planning Model for Closed-loop Manufacturing System
김영우
265
2012
optimal real-time pricing algorighm based on utility maximization for smart grid
김동현
264
2012
Enterprise integration and interoperability in manufacturing systems
김한국
263
2012
제조 실행시스템의 성과 측정을 위한 프레임워크 개발 연구
황규선
»
2012
공정재고를 고려한 선박 생산 스케줄링에 관한 연구
이성진
261
2012
Quantitavie analysis and cost minimization of product damage
이재봉
260
2012
Scheduling in RMC: An integrative approach (on going research)
서진우
259
2012
Dissertation Plan + Paper Review
이동명
258
2012
Designing data system for remanufacturing with radio frequency identification technology
김영우
257
2012
Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles
김동현
256
2012
Auditing a manufacturing system using performance measurement
황규선
255
2012
Path Selection Model and Algorithm for Emergency Logistics Management
김한국
254
2012
A Study on Emergency Logistics Management System For Effective and Efficient Response in Disastrous Situations
한수민
253
2012
Scheduling in RMC: An integrative approach (on going research)
서진우
252
2012
Decision Support System for Multi-loop Recovery Using Recycle Bill
김영우
251
2012
Auditing the manufacturing system using IT governance tools
황규선
250
2011
Reducing the Level of the Waiting Blocks in the Shipbuilding Industry by Using the Theory of Constraints
이성진
249
2011
Development of practical machine scheduler in worker-involved reconfigurable manufacturing cell(비공개)
서진우
248
2011
Auditing the manufacturing system using IT governance tools
황규선
247
2011
군용 항공기 일일 비행임무 계획을 위한 항공기 할당 문제
박준호
쓰기
목록
첫 페이지
1
2
3
4
5
6
7
8
9
끝 페이지
Board Search
제목+내용
제목
내용
댓글
이름
닉네임
아이디
태그
Key Words
검색
Contributors
Tag List