Research

year 1999 
author Byeongdae Choi 
Keyword Order Review/Release, Dispatching rule, Production Control Policy, Simulation 
Abstract Two major activities in the manufacturing firm is the manufacturing planning and the execution/control on the shop floor. The integration of planning and execution/control under a common objective is a key factor which determine the success or failure of the business. Executable plan to cope with changing demand is possible through the correct master data and the predictable shop floor activities as well as the demand forecast ability. And the efficiency and stability of shop floor can be achieved through a stable and executable manufacturing plan. The interdependence between planning and shop floor activities may bring about a vicious circle of an uncertainty on the shop floor and a nervousness of planning. What is most important to escape from a vicious circle is to reduce and stabilize the lead time. Order Review/Release (ORR) System is the linkage between planning system and shop floor. Reduction of the waiting time on the shop floor, work in process and lead time variation may be achieved by adopting ORR strategies. ORR determines which orders are allowed to be released to the shop floor, at which and under what condition considering shop floor and order information. But researchers on the ORR do not agree on the effectiveness of ORR. Some say that the overall system flow time may be increased if ORR is adopted, but others say that ORR can reduce work in process, shop flow time and variation of flow time. The objective of this research is to clarify under what environments order release strategy is effective. First, this research examines the effectiveness of two shop floor control policies (five workload limited order release mechanisms and three dispatching rules) under two environmental variables(two shop utilization levels and three planned order release intervals from planning system to the Pre Shop Pool) in terms of eight performance measures relating to lead time, delivery and work in process. Second, this research examines the effects of plan smoothing to the ORR. Simulation study was conducted in a hypothetical job shop. The experimental results show that dispatching rule is much more important than ORR is in controlling the shop floor. But the results indicate that ORR can reduce mean shop flow time, average WIP and variation of shop flow time under such environments where utilization level is high and planned order is weekly released to the Pre Shop Pool. And the results also show that the effect of plan smoothing on the ORR is insignificant, which is inconsistent with the results of the previous researches. In conclusion, ORR is not a substitute but a supplementary policy of dispatching rule. By adopting ORR in addition to dispatching rule, it is possible to reduce shop floor time, work in process and deviation of lead time, especially under environments where planning system which release planned order periodically is present. 
c MS 

Download :

번호 c year 제목 author
111 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang 
110 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
109 MS  1992  A Decision Support System for A Machine Specifications in Design of An FMS [6] Youngkwan Ko 
108 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
107 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
106 MS  2002  Design and Implementation of Model Management System for Supply Chain Planning [1] Youngcheol Yang 
105 MS  1990  A Fuzzy Linguistic Approach to the Part Selection Problem in FMS [1] Yoosuk Hong 
104 MS  1996  A Study on the Generation and DB Construction of Modular BOM [1] Yonggu Ji 
103 PhD  2002  Flexible Job Shop Scheduling with Multi-level Job Structures [16] Yangja Jang 
102 PhD  2004  Ontology Development for e-Business Integration [26] Tai-Woo Chang 
101 MS  2000  Design of a Hybrid System in Integrating Kanban with MRP [2] Taeyoung Song 
100 PhD  2005  Development of an algorithm for multi-plant production plans in a supply chain [50] Sungwon Jung 
99 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
98 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
97 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
96 MS  1993  A Study on the Computer-Aided Process Planning for Rotational Parts Considering Machine Status [1] Sungbum Chun 
95 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun 
94 MS  1992  A Study on Production Planning Problems in a Flexible Machining and Assembly System [1] Sukang Lee 
93 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
92 MS  1995  A Study on knowledge Acquisition for Simulation-based Scheduling Expert System [1] Soohyun Lee 
91 MS  1998  A Study on UML representation of CIM-OSA and availability of analysis and design pattern in CIM-OSA [1] Seungoh Han 
90 MS  1999  A Study on the Development of Event-driven MRP Components Considering Capacity Constraints [1] Seunghyun Yoon 
89 PhD  1991  An Integrated Decision Support System for FMS Planning and Control Problems [11] Seongyoung Jang 
88 MS  1995  A study on intelligent dispatching strategy in Automated Manufacturing Systems [5] Seongwoo Lee 
87 MS  1993  A Supervisory Control Approach to Rapid Implementation of Low-Level Control Software for FMC [1] Sangkyun Kim 
86 PhD  1997  Computer-Aided Synthesis of the Execution Controllers for Workcells in Computer Integrated Manufacturing Systems [18] Sangkyun Kim 
85 MS  1997  A New Approach to Master Production Scheduling in the MRP environment [1] Sangdo Choi 
84 MS  1991  A Study on Performance Evaluation of Production Plan for FMS Using Queueing Network [1] Sangbok Woo 
83 PhD  1997  A Study on the Integration of Loading and Scheduling in Flexible Manufacturing Systems [21] Sangbok Woo 
82 MS  1988  Development of a Classification and Coding System through Fuzzy Sets Approach [1] Namkyu Park 
81 PhD  1994  A Study on Design of a Cooperative- Distributed Shop Floor Control System for Computer Integrated Manufacturing [19] Namkyu Park 
80 MS  1995  A study on Real-Time Collection of Shop Floor Data Using Speech Recognition [2] Namjoo Kim 
79 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
78 MS  2001  A Study of Decision Support for the implementation of Cellular Manufacturing Systems. [1] Muynghee Byun 
77 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
76 PhD  2010  Enhancing Flexibility and Responsiveness in Sales Order Management [54] Mokmin Park 
75 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
74 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
73 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
72 MS  1995  An Object-Oriented Framework for the Implementation of Distributed Shop Floor Control in FMS [2] Kyungsuk Lee 
71 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
70 PhD  1995  Design Support System for the Conceptual Design of Manufacturing Databases [13] Kitae Shin 
69 MS  1990  A Study on Data Allocation Problems for Distributed Database Design [2] Kitae Shin 
68 MS  1994  A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation [1] Kitae Kim 
67 PhD  1999  A Study on the Manufacturing System State Based Scheduler using Neural Network and Simulator [20] Kitae Kim 
66 MS  1989  A Study on the Computer and Database Location of Distributed Computer Systems in FMS [1] Kilsup Yang 
65 MS  2009  A Study on the Economic Feasibility of Automated Identification Technology on the ELV Management Process [25] file Kiheon Nam 
64 MS  1991  A Study on Image Processing and CAD - Vision System Interface of Manufactured Parts [1] Kidong Kim 
63 PhD  1997  A Study on the Integration of Process Planning and Scheduling [3] Kidong Kim 
62 MS  1997  A Scheduling Algorithm Considering Subcontractor and Machine Setup Cost in MRP Environment [1] Kichang Lee