Research

year 1999 
author Byeongdae Choi 
Keyword Order Review/Release, Dispatching rule, Production Control Policy, Simulation 
Abstract Two major activities in the manufacturing firm is the manufacturing planning and the execution/control on the shop floor. The integration of planning and execution/control under a common objective is a key factor which determine the success or failure of the business. Executable plan to cope with changing demand is possible through the correct master data and the predictable shop floor activities as well as the demand forecast ability. And the efficiency and stability of shop floor can be achieved through a stable and executable manufacturing plan. The interdependence between planning and shop floor activities may bring about a vicious circle of an uncertainty on the shop floor and a nervousness of planning. What is most important to escape from a vicious circle is to reduce and stabilize the lead time. Order Review/Release (ORR) System is the linkage between planning system and shop floor. Reduction of the waiting time on the shop floor, work in process and lead time variation may be achieved by adopting ORR strategies. ORR determines which orders are allowed to be released to the shop floor, at which and under what condition considering shop floor and order information. But researchers on the ORR do not agree on the effectiveness of ORR. Some say that the overall system flow time may be increased if ORR is adopted, but others say that ORR can reduce work in process, shop flow time and variation of flow time. The objective of this research is to clarify under what environments order release strategy is effective. First, this research examines the effectiveness of two shop floor control policies (five workload limited order release mechanisms and three dispatching rules) under two environmental variables(two shop utilization levels and three planned order release intervals from planning system to the Pre Shop Pool) in terms of eight performance measures relating to lead time, delivery and work in process. Second, this research examines the effects of plan smoothing to the ORR. Simulation study was conducted in a hypothetical job shop. The experimental results show that dispatching rule is much more important than ORR is in controlling the shop floor. But the results indicate that ORR can reduce mean shop flow time, average WIP and variation of shop flow time under such environments where utilization level is high and planned order is weekly released to the Pre Shop Pool. And the results also show that the effect of plan smoothing on the ORR is insignificant, which is inconsistent with the results of the previous researches. In conclusion, ORR is not a substitute but a supplementary policy of dispatching rule. By adopting ORR in addition to dispatching rule, it is possible to reduce shop floor time, work in process and deviation of lead time, especially under environments where planning system which release planned order periodically is present. 
c MS 

Download :

번호 c year 제목 author
111 MS  2014  A study on operational models for electric vehicle battery switch stations in smart grid environment Dong Hyun Kim 
110 PhD  2014  Multi-level job scheduling in a flexible discrete-part production environment Hong Bum Na 
109 PhD  2014  A study on integrative decision-making system for reconfigurable manufacturing cells Jin Wu Seo 
108 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun 
107 MS  2013  Design of an inspection system for reducing quality deterioration under VMI supply chain management system [16] Jaebong Lee 
106 MS  2013  Developing integrated key performance indicators and measurement scheme for MES [19] file Gyusun Hwang 
105 PhD  2013  Price of Simplicity under Congestion: On the Revenue and Pricing Schemes in the Telecommunication Industry [58] file Dongmyung Lee 
104 PhD  2013  A study on production scheduling problems considering differential electricity pricing and distributed generations Jun Young Moon 
103 MS  2012  The study on target allocation model using simulation for counter-fire execution [22] Jeonghun Kim 
102 MS  2012  Flight and Maintenance Planning of Miliary Aircraft considering Preventive Maintenance Period [13] Jun-Ho Park 
101 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
100 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
99 MS  2011  A Study on RMC Scheduling using Simulation [19] Jeongho Park 
98 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
97 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
96 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
95 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
94 PhD  2010  Framework for Integrative SRM System and Collaboration Scorecard [26] Jongkyoung Park 
93 PhD  2010  Enhancing Flexibility and Responsiveness in Sales Order Management [54] Mokmin Park 
92 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
91 MS  2009  A Study on Integrated Risk Management in Supply Chain - Focusing on High-tech Electronic Industry [52] file Kanghyun Kim 
90 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
89 MS  2009  A Study on the Economic Feasibility of Automated Identification Technology on the ELV Management Process [25] file Kiheon Nam 
88 PhD  2009  A Study for Business Process Improvement Using Real-time Information of Unbalanced Work [19] Jaehyun Kong 
87 PhD  2008  A study on integrated production planning and strategic framework in supply chain [15] Haejoong Kim 
86 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
85 MS  2008  A study on supplier's performance measurements for a supply chain on a new product environment [1] Jungsub Lee 
84 MS  2008  Integration of RFID and Web Service Technology in Manufacturing Systems [20] file Gunnam Ong 
83 MS  2007  A Study on the Valuation of a Supply Chain Considering Management Efficiency and Environmental Effect [53] Jiyoun Kim 
82 MS  2007  A Study on Project Risk Management based on Earned Value Management [25] file Hyunil Noh 
81 MS  2007  A Study on BOM for Enhancing Efficiency of Reverse Supply Chain [14] Jinseon Yoo 
80 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
79 PhD  2007  A Study on MRP Process Improvement in a Grid Enabled APS [2] file Hyoung-Gon Lee 
78 MS  2007  A Simulation Study on the Impact of RFID Technology on the Supply Chain Counting Process [13] file Jangwon Cho 
77 MS  2006  A Study on the Application of Group Technology for Naval Ship Design And Manufacturing: Relating to Platform Family Architecture [17] Gwangjae Park 
76 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
75 MS  2006  A Study on the Assessment Method of Installation and Operation Cost in a Reverse Supply Chain [2] file Hyunjong Jeong 
74 PhD  2005  A Study on the Integration of Quality Designing and Process Control in Steel Industry [15] Jonghan Kim 
73 PhD  2005  Performance Analysis and Network Design of Supply Chain for Strategic Decision Making [14] Eoksu Sim 
72 MS  2005  A Study on RFID application in Reverse Supply Chain [3] Dongjoon Lim 
71 MS  2005  Development of Reference Model and Strategic Road Map for the Implementation of a Reverse Supply Chain [183] Chihoon Lim 
70 MS  2005  A Study on Developing of Position collecting Vision system Using Marker [1] Jiyoon Park 
69 MS  2005  A Study on Product Development Methodology in Reverse Supply Chain [77] Joon Kim 
68 PhD  2005  Development of an algorithm for multi-plant production plans in a supply chain [50] Sungwon Jung 
67 PhD  2004  Ontology Development for e-Business Integration [26] Tai-Woo Chang 
66 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
65 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
64 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang 
63 MS  2004  A Design on Cost-Estimation Support System for Injection Mold Using AI Method [12] Gunhee Kim 
62 MS  2004  A study on due-date assignment method in wafer fabrication facility producing multiple product types [3] Jaewon Park