Research

year 2003 
author Kichang Lee 
Keyword manufacturing system design, process model, Petri net, performance model and optimization, simulation 
Abstract In rapidly changing enterprise environments, frequent design activities of a manufacturing system are required. Manufacturing system design decisions have a long term effect on system performance. Moreover, they are so complex problems that coordination and cooperation among departments are necessary to evaluate and improve design alternatives to support the design process, systemic process modeling function and performance analysis/optimization function should be provided in an integrated manner.

In this research, we suggest a new process modeling technique, called PFN(Product Flow Network), as a substitute of previous modeling techniques such as IDEF0, IDEF3, and the ones used in enterprise modeling frameworks. PFN is a directed graph defined for a part to represent the activities and the relationships among them which are necessary to product the part. Connections among nodes can have AND OR XOR types by which various relationships may be captured.

We adopted lead time and manufacturing costs as performance measures. To predict these performance measures for a given design alternatives, Petri net approach is used. We classified a manufacturing system into closed system and open system. In a closed system, the maximum number of parts that may exist in a system is pre-determined. On the other hand, an open system has no such constraints. Petri net models have been constructed for closed and open systems respectively. In addition, an algorithm has been provided to automatically transform a PFM into a Petri net. Before this transformation, XOR elimination algorithm has been suggested, which makes the transformation procedure easy.

In a Petri net for a closed system, as the size of subjective system increases, the computational capability decreased dramatically. To circumvent this shortage, a consolidation approach, which simplifies a Petri net, has been devised. Experimental results are included which show the feasibility of the consolidation. An open system cannot be modeled as a Petri net completely, because the analysis used Markov chain. In this research only service area of a system modeled by Petri net, and arrival area is considered in performance analysis. This approach is new and proved to be effective by simulation experiments. In addition it provides mathematical functions for average lead time and manufacturing costs. Using this functions, we constructed mathematical formulation to minimize average lead time satisfying given manufacturing costs and to minimize total manufacturing costs given average lead time.

In the formulation, lead time function is nonlinear so that the problems cannot be solved directly by commercial optimizer. We adopted linearization procedure in separable programming. By this procedure, nonlinear function can be linearized, which can be solved optimization package such as ILOG CPLEX. We performed simulation experiments for lead time optimization model and manufacturing cost optimization model to validate the formulation. In the result, the mathematical model proved to generate optimized design alternative effectively.

The methodology suggested in this research would make possible to generate various alternatives and to compute optimize performances in the early stage of manufacturing system design process. A computerized environment for this methodology would be more beneficial in supporting the design activities. 
c PhD 

Download :

번호 c year 제목 author
111 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang 
110 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
109 MS  1992  A Decision Support System for A Machine Specifications in Design of An FMS [6] Youngkwan Ko 
108 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
107 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
106 MS  2002  Design and Implementation of Model Management System for Supply Chain Planning [1] Youngcheol Yang 
105 MS  1990  A Fuzzy Linguistic Approach to the Part Selection Problem in FMS [1] Yoosuk Hong 
104 MS  1996  A Study on the Generation and DB Construction of Modular BOM [1] Yonggu Ji 
103 PhD  2002  Flexible Job Shop Scheduling with Multi-level Job Structures [16] Yangja Jang 
102 PhD  2004  Ontology Development for e-Business Integration [26] Tai-Woo Chang 
101 MS  2000  Design of a Hybrid System in Integrating Kanban with MRP [2] Taeyoung Song 
100 PhD  2005  Development of an algorithm for multi-plant production plans in a supply chain [50] Sungwon Jung 
99 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
98 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
97 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
96 MS  1993  A Study on the Computer-Aided Process Planning for Rotational Parts Considering Machine Status [1] Sungbum Chun 
95 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun 
94 MS  1992  A Study on Production Planning Problems in a Flexible Machining and Assembly System [1] Sukang Lee 
93 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
92 MS  1995  A Study on knowledge Acquisition for Simulation-based Scheduling Expert System [1] Soohyun Lee 
91 MS  1998  A Study on UML representation of CIM-OSA and availability of analysis and design pattern in CIM-OSA [1] Seungoh Han 
90 MS  1999  A Study on the Development of Event-driven MRP Components Considering Capacity Constraints [1] Seunghyun Yoon 
89 PhD  1991  An Integrated Decision Support System for FMS Planning and Control Problems [11] Seongyoung Jang 
88 MS  1995  A study on intelligent dispatching strategy in Automated Manufacturing Systems [5] Seongwoo Lee 
87 MS  1993  A Supervisory Control Approach to Rapid Implementation of Low-Level Control Software for FMC [1] Sangkyun Kim 
86 PhD  1997  Computer-Aided Synthesis of the Execution Controllers for Workcells in Computer Integrated Manufacturing Systems [18] Sangkyun Kim 
85 MS  1997  A New Approach to Master Production Scheduling in the MRP environment [1] Sangdo Choi 
84 MS  1991  A Study on Performance Evaluation of Production Plan for FMS Using Queueing Network [1] Sangbok Woo 
83 PhD  1997  A Study on the Integration of Loading and Scheduling in Flexible Manufacturing Systems [21] Sangbok Woo 
82 MS  1988  Development of a Classification and Coding System through Fuzzy Sets Approach [1] Namkyu Park 
81 PhD  1994  A Study on Design of a Cooperative- Distributed Shop Floor Control System for Computer Integrated Manufacturing [19] Namkyu Park 
80 MS  1995  A study on Real-Time Collection of Shop Floor Data Using Speech Recognition [2] Namjoo Kim 
79 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
78 MS  2001  A Study of Decision Support for the implementation of Cellular Manufacturing Systems. [1] Muynghee Byun 
77 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
76 PhD  2010  Enhancing Flexibility and Responsiveness in Sales Order Management [54] Mokmin Park 
75 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
74 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
73 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
72 MS  1995  An Object-Oriented Framework for the Implementation of Distributed Shop Floor Control in FMS [2] Kyungsuk Lee 
71 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
70 PhD  1995  Design Support System for the Conceptual Design of Manufacturing Databases [13] Kitae Shin 
69 MS  1990  A Study on Data Allocation Problems for Distributed Database Design [2] Kitae Shin 
68 MS  1994  A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation [1] Kitae Kim 
67 PhD  1999  A Study on the Manufacturing System State Based Scheduler using Neural Network and Simulator [20] Kitae Kim 
66 MS  1989  A Study on the Computer and Database Location of Distributed Computer Systems in FMS [1] Kilsup Yang 
65 MS  2009  A Study on the Economic Feasibility of Automated Identification Technology on the ELV Management Process [25] file Kiheon Nam 
64 MS  1991  A Study on Image Processing and CAD - Vision System Interface of Manufactured Parts [1] Kidong Kim 
63 PhD  1997  A Study on the Integration of Process Planning and Scheduling [3] Kidong Kim 
62 MS  1997  A Scheduling Algorithm Considering Subcontractor and Machine Setup Cost in MRP Environment [1] Kichang Lee