Research

year 2005 
author Jonghan Kim 
Keyword Case-based Reasoning, Integrated System, Quality Designing, Scheduling, Process Control, Steel Industry 
Abstract To cope with the rapid changes in business environment, typical large-scale complex industries such as the steel industry are in the process of building computer integrated production systems to strengthen competitiveness by promoting the flexibility and productivity of the production system. In particular, the promotion of the productivity and flexibility of the production process in the steel industry has been regarded as a core element in effectively meeting changes in the market. Despite such importance, however, few studies have been conducted to promote productivity and flexibility during the process of solving various problems in the steel industry. Promoting productivity and flexibility in the steel industry requires appropriate planning and execution of quality design and process control. The problem is extremely difficult and complicated because not only should the basic restraints in the quality design stage be considered but also the process planning and process capability during the process control stage be taken into account to realize said purposes.


To date, research activities carried out to solve such problems have approached overall problems by segregating them into several stages. However, it still is difficult to obtain an optimal solution even for the segregated problem within a realistic timetable. In addition, it raises yet another problem, i.e., difficulty to set targets that enhance the achievement level in process management during the quality design stage. This study is a result of an effort to develop a structure and solution of an integrated system that can make decisions regarding quality design, scheduling, and process control. At the same time, the solution improves the flexibility of the steelmanufacturing process by integrating and solving problems related to quality design and process management in the steel industry.


The proposed integration system is composed of a structure that solves the entire problem by linking three modules: (1) “quality design generation module,” which creates quality design; (2) “module that maximizes productivity in scheduling,” which considers the alternatives derived from quality design, and; (3) “process control module,” which seeks to achieve the optimum level of accomplishment in the process where the deduced quality design and scheduling are executed.


The quality design formation module presents a solution that creates optimum quality design using the case-based reasoning methodology. This module proposes and uses a fuzzy similarity index and a productivity maximization index to evaluate similar cases. It also presents a solution that can deduce a new alternative plan for quality design according to the requirements of customers, thereby suggesting its superiority as verified through experiments.


The scheduling creation module is based on the formulation of the Bin-Packing problem, which is characterized by several alternative plans for quality design and many customer orders. After developing the corresponding solution, the appropriateness and efficiency of the solution were verified through experiments.



Finally, the process control module seeks to achieve the optimum accomplishment level of the steel-making process where quality design and scheduling are executed. It proposes a forecast module for process control using a case-based reasoning methodology. The application of the model to experimental problems and to real industrial problems proved the superiority of the proposed solution. Moreover, since the process control module may work independently from the quality design and scheduling modules, it can be used effectively in the existing steel industry.



From the experiments, the resulting integrated approach exhibited superiority in terms of the accomplishment level compared to the existing step by step approach. Since the difference tends to increase gradually as the number of alternatives for quality design increases, the integrated approach is found to be more useful in solving actual problems.



This study contributed in raising productivity of the steel industry by integrating and giving solutions to quality design and process control problems of the steel industry, where alternative plans for quality design exist. 
c PhD 

Download :

번호 c year 제목 author
35 MS  1994  A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation [1] Kitae Kim 
34 MS  1990  A Study on Data Allocation Problems for Distributed Database Design [2] Kitae Shin 
33 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
32 MS  1995  An Object-Oriented Framework for the Implementation of Distributed Shop Floor Control in FMS [2] Kyungsuk Lee 
31 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
30 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
29 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
28 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
27 MS  2001  A Study of Decision Support for the implementation of Cellular Manufacturing Systems. [1] Muynghee Byun 
26 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
25 MS  1995  A study on Real-Time Collection of Shop Floor Data Using Speech Recognition [2] Namjoo Kim 
24 MS  1988  Development of a Classification and Coding System through Fuzzy Sets Approach [1] Namkyu Park 
23 MS  1991  A Study on Performance Evaluation of Production Plan for FMS Using Queueing Network [1] Sangbok Woo 
22 MS  1997  A New Approach to Master Production Scheduling in the MRP environment [1] Sangdo Choi 
21 MS  1993  A Supervisory Control Approach to Rapid Implementation of Low-Level Control Software for FMC [1] Sangkyun Kim 
20 MS  1995  A study on intelligent dispatching strategy in Automated Manufacturing Systems [5] Seongwoo Lee 
19 MS  1999  A Study on the Development of Event-driven MRP Components Considering Capacity Constraints [1] Seunghyun Yoon 
18 MS  1998  A Study on UML representation of CIM-OSA and availability of analysis and design pattern in CIM-OSA [1] Seungoh Han 
17 MS  1995  A Study on knowledge Acquisition for Simulation-based Scheduling Expert System [1] Soohyun Lee 
16 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
15 MS  1992  A Study on Production Planning Problems in a Flexible Machining and Assembly System [1] Sukang Lee 
14 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun 
13 MS  1993  A Study on the Computer-Aided Process Planning for Rotational Parts Considering Machine Status [1] Sungbum Chun 
12 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
11 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
10 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
9 MS  2000  Design of a Hybrid System in Integrating Kanban with MRP [2] Taeyoung Song 
8 MS  1996  A Study on the Generation and DB Construction of Modular BOM [1] Yonggu Ji 
7 MS  1990  A Fuzzy Linguistic Approach to the Part Selection Problem in FMS [1] Yoosuk Hong 
6 MS  2002  Design and Implementation of Model Management System for Supply Chain Planning [1] Youngcheol Yang 
5 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
4 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
3 MS  1992  A Decision Support System for A Machine Specifications in Design of An FMS [6] Youngkwan Ko 
2 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
1 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang