Research

year 2005 
author Jonghan Kim 
Keyword Case-based Reasoning, Integrated System, Quality Designing, Scheduling, Process Control, Steel Industry 
Abstract To cope with the rapid changes in business environment, typical large-scale complex industries such as the steel industry are in the process of building computer integrated production systems to strengthen competitiveness by promoting the flexibility and productivity of the production system. In particular, the promotion of the productivity and flexibility of the production process in the steel industry has been regarded as a core element in effectively meeting changes in the market. Despite such importance, however, few studies have been conducted to promote productivity and flexibility during the process of solving various problems in the steel industry. Promoting productivity and flexibility in the steel industry requires appropriate planning and execution of quality design and process control. The problem is extremely difficult and complicated because not only should the basic restraints in the quality design stage be considered but also the process planning and process capability during the process control stage be taken into account to realize said purposes.


To date, research activities carried out to solve such problems have approached overall problems by segregating them into several stages. However, it still is difficult to obtain an optimal solution even for the segregated problem within a realistic timetable. In addition, it raises yet another problem, i.e., difficulty to set targets that enhance the achievement level in process management during the quality design stage. This study is a result of an effort to develop a structure and solution of an integrated system that can make decisions regarding quality design, scheduling, and process control. At the same time, the solution improves the flexibility of the steelmanufacturing process by integrating and solving problems related to quality design and process management in the steel industry.


The proposed integration system is composed of a structure that solves the entire problem by linking three modules: (1) “quality design generation module,” which creates quality design; (2) “module that maximizes productivity in scheduling,” which considers the alternatives derived from quality design, and; (3) “process control module,” which seeks to achieve the optimum level of accomplishment in the process where the deduced quality design and scheduling are executed.


The quality design formation module presents a solution that creates optimum quality design using the case-based reasoning methodology. This module proposes and uses a fuzzy similarity index and a productivity maximization index to evaluate similar cases. It also presents a solution that can deduce a new alternative plan for quality design according to the requirements of customers, thereby suggesting its superiority as verified through experiments.


The scheduling creation module is based on the formulation of the Bin-Packing problem, which is characterized by several alternative plans for quality design and many customer orders. After developing the corresponding solution, the appropriateness and efficiency of the solution were verified through experiments.



Finally, the process control module seeks to achieve the optimum accomplishment level of the steel-making process where quality design and scheduling are executed. It proposes a forecast module for process control using a case-based reasoning methodology. The application of the model to experimental problems and to real industrial problems proved the superiority of the proposed solution. Moreover, since the process control module may work independently from the quality design and scheduling modules, it can be used effectively in the existing steel industry.



From the experiments, the resulting integrated approach exhibited superiority in terms of the accomplishment level compared to the existing step by step approach. Since the difference tends to increase gradually as the number of alternatives for quality design increases, the integrated approach is found to be more useful in solving actual problems.



This study contributed in raising productivity of the steel industry by integrating and giving solutions to quality design and process control problems of the steel industry, where alternative plans for quality design exist. 
c PhD 

Download :

번호 c year 제목 author
35 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang 
34 MS  2004  A Design on Cost-Estimation Support System for Injection Mold Using AI Method [12] Gunhee Kim 
33 MS  2004  A study on due-date assignment method in wafer fabrication facility producing multiple product types [3] Jaewon Park 
32 MS  2005  A Study on RFID application in Reverse Supply Chain [3] Dongjoon Lim 
31 MS  2005  Development of Reference Model and Strategic Road Map for the Implementation of a Reverse Supply Chain [183] Chihoon Lim 
30 MS  2005  A Study on Developing of Position collecting Vision system Using Marker [1] Jiyoon Park 
29 MS  2005  A Study on Product Development Methodology in Reverse Supply Chain [77] Joon Kim 
28 MS  2006  A Study on the Application of Group Technology for Naval Ship Design And Manufacturing: Relating to Platform Family Architecture [17] Gwangjae Park 
27 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
26 MS  2006  A Study on the Assessment Method of Installation and Operation Cost in a Reverse Supply Chain [2] file Hyunjong Jeong 
25 MS  2007  A Study on the Valuation of a Supply Chain Considering Management Efficiency and Environmental Effect [53] Jiyoun Kim 
24 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
23 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
22 MS  2009  A Study on Integrated Risk Management in Supply Chain - Focusing on High-tech Electronic Industry [52] file Kanghyun Kim 
21 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
20 MS  2009  A Study on the Economic Feasibility of Automated Identification Technology on the ELV Management Process [25] file Kiheon Nam 
19 MS  2007  A Study on Project Risk Management based on Earned Value Management [25] file Hyunil Noh 
18 MS  2007  A Study on BOM for Enhancing Efficiency of Reverse Supply Chain [14] Jinseon Yoo 
17 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
16 MS  2007  A Simulation Study on the Impact of RFID Technology on the Supply Chain Counting Process [13] file Jangwon Cho 
15 MS  2008  A study on supplier's performance measurements for a supply chain on a new product environment [1] Jungsub Lee 
14 MS  2008  Integration of RFID and Web Service Technology in Manufacturing Systems [20] file Gunnam Ong 
13 MS  2011  A Study on RMC Scheduling using Simulation [19] Jeongho Park 
12 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
11 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
10 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
9 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
8 MS  2012  The study on target allocation model using simulation for counter-fire execution [22] Jeonghun Kim 
7 MS  2012  Flight and Maintenance Planning of Miliary Aircraft considering Preventive Maintenance Period [13] Jun-Ho Park 
6 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
5 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
4 MS  2013  Design of an inspection system for reducing quality deterioration under VMI supply chain management system [16] Jaebong Lee 
3 MS  2013  Developing integrated key performance indicators and measurement scheme for MES [19] file Gyusun Hwang 
2 MS  2014  A study on operational models for electric vehicle battery switch stations in smart grid environment Dong Hyun Kim 
1 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun