Research

year 2007 
author Hyoung-Gon Lee 
Keyword MRP, Part explosion, APS, Real-time processing, Computational grid, Distributed databases, Feedforward CRP, Hierarchical structures, Main-memory virtual DB 
Abstract The material requirement planning (MRP) process is a core function to generate an exact and efficient plan for manufacturing enterprises so that appropriate quantities of raw materials and subassemblies are provided at the right time. Providing an executable production plan at high speed has remained a goal for MRP since the process was first developed in the 1970s. However, due to the time consuming characteristic of the process with its intensive database (DB) interaction, real time processing remained unattainable, whereas the unrealized ideal of MRP, which was prematurely heralded as an add-on module called advanced planning system (APS) in the 1990s, remains as yet unachieved.
APS differs from conventional MRP in its simultaneous consideration of the aterial
and resource requirements. Established studies and commercial solutions have attempted to make MRP more practical through its integration with capacity planning in a closedloop planning system. However, despite enormous research efforts the problem of processing time has remained largely unsolved, as the solution remains unattainable within a sufficiently short time for practical application. On the other hand, many studies for improving the performance of DB systems have focused on the modification of the data structure, data partitioning, and materialization strategies. In addition, grid computing technology, which aims to utilize unused computing power capacity via internet networking, is being broadly introduced in business. However, to the best of our knowledge, no attempt has yet been made to apply these advanced computing technologies to the MRP part explosion process. This paper proposes a grid enabled APS considering finite-capacitated MRP part explosion process in a distributed DB environment and demonstrates its substantially improved performance. The proposed system comprises four MRP maintenance steps: master data synchronization, job distribution, part explosion, and writing back steps. In
addition to being the first attempt to apply a computational grid to the MRP domain, our proposed system features two further distinctive points. First, the entire process terminates in one step, termed feedforward capacity requirement planning (CRP), even though it contains capacity planning corrections. Second, all the part explosion processes which are performed by multiple resources are accelerated by utilizing its hierarchical structure with processing queries in the virtual DB of the main memory.
In particular, the MRP part explosion process was found to be much faster using grid resources, with an almost n-fold increase in acceleration with n nodes, assuming that the master data are synchronized among the resources and that the writing back step is performed afterwards. Considering the marginal effect obtained from the main memory operation and feedforward CRP, a speedup ratio of 13n was attained for finitecapacitated MRP with deep binary-tree type bill of material (BOM) more than 10 levels.
Several experimental results are presented to illustrate the performance of the proposed approach. 
c PhD 
번호 c year 제목 author
35 MS  1994  A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation [1] Kitae Kim 
34 MS  1990  A Study on Data Allocation Problems for Distributed Database Design [2] Kitae Shin 
33 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
32 MS  1995  An Object-Oriented Framework for the Implementation of Distributed Shop Floor Control in FMS [2] Kyungsuk Lee 
31 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
30 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
29 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
28 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
27 MS  2001  A Study of Decision Support for the implementation of Cellular Manufacturing Systems. [1] Muynghee Byun 
26 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
25 MS  1995  A study on Real-Time Collection of Shop Floor Data Using Speech Recognition [2] Namjoo Kim 
24 MS  1988  Development of a Classification and Coding System through Fuzzy Sets Approach [1] Namkyu Park 
23 MS  1991  A Study on Performance Evaluation of Production Plan for FMS Using Queueing Network [1] Sangbok Woo 
22 MS  1997  A New Approach to Master Production Scheduling in the MRP environment [1] Sangdo Choi 
21 MS  1993  A Supervisory Control Approach to Rapid Implementation of Low-Level Control Software for FMC [1] Sangkyun Kim 
20 MS  1995  A study on intelligent dispatching strategy in Automated Manufacturing Systems [5] Seongwoo Lee 
19 MS  1999  A Study on the Development of Event-driven MRP Components Considering Capacity Constraints [1] Seunghyun Yoon 
18 MS  1998  A Study on UML representation of CIM-OSA and availability of analysis and design pattern in CIM-OSA [1] Seungoh Han 
17 MS  1995  A Study on knowledge Acquisition for Simulation-based Scheduling Expert System [1] Soohyun Lee 
16 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
15 MS  1992  A Study on Production Planning Problems in a Flexible Machining and Assembly System [1] Sukang Lee 
14 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun 
13 MS  1993  A Study on the Computer-Aided Process Planning for Rotational Parts Considering Machine Status [1] Sungbum Chun 
12 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
11 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
10 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
9 MS  2000  Design of a Hybrid System in Integrating Kanban with MRP [2] Taeyoung Song 
8 MS  1996  A Study on the Generation and DB Construction of Modular BOM [1] Yonggu Ji 
7 MS  1990  A Fuzzy Linguistic Approach to the Part Selection Problem in FMS [1] Yoosuk Hong 
6 MS  2002  Design and Implementation of Model Management System for Supply Chain Planning [1] Youngcheol Yang 
5 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
4 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
3 MS  1992  A Decision Support System for A Machine Specifications in Design of An FMS [6] Youngkwan Ko 
2 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
1 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang