Research

year 1996 
author Hanil Jeong 
Keyword Batch Splitting, Improving Schedule, Job Shop Scheduling, Before-Arrival Family Setup Time, Branch and Bound 
Abstract The job shop scheduling problem has been a major target for many researchers. However, most of the past studies assumed that a job consists of only a single part. With this assumption, the master production schedule and MRP output must be modified when production requirement from MRP( Material Requirement Planning )for a planning period exceeds the capacity of production system.

In addition to that, a real factory is full of unexpectedness and dynamics. Due to such dynamic nature of shop floor, the requirements for production volume and due date can not easily be satisfied under the assumption that a job consists of a single part. In many cases of real manufacturing environment, however, a job does not consist of a single part but a set of parts of same type, so-called a batch. We can alleviate the problems mentioned above by considering characteristics of batch. That is to say, if we allow each part which constitute a batch to be processed independently, then we can obtain an improved schedule because we can fill up the idle times of machines with jobs of smaller processing time. However, then, the size of the scheduling problem would become too large to be solved in practical time limit, and the clerical work will also increase to handle the increased number of production orders. And so, there may be an optimum batch size considering trade-off between better solution and tractability.

We propose an improved scheduling algorithm when a job consists of a batch. For this algorithm, we try to minimize makespan or maximum lateness for job shop scheduling problem considering before-arrival family setup time, transportation time, release date and due date. Our scheduling algorithm can be divided into two parts. The first part selects a batch to be splitted and splits it into smaller batches. The second part solves the new job shop scheduling problem with smaller batches. The batch splitting algorithm selects a batch to be splitted based on information of lateness and idle time, and then its size is determined by batch splitting strategy. The proposed job shop scheduling algorithm contains a new branch and bound algorithm to minimize makespan for single machine sequencing problem considering before-arrival family setup time, release date and delivery time. This algorithm starts with obtaining a single machine sequencing problem using the characteristic values of operation from disjunctive graph which represents job shop scheduling problem. Final solution is obtained by applying proposed single machine sequencing algorithm iteratively. The proposed new branch and bound algorithm for single machine sequencing problem consists of five modules, they are branching, determining precedence, modifying characteristic values of operations, generating heuristic solution and calculating lower bound modules.

Experimental results show that the proposed single machine sequencing algorithm finds an optimal solution within small time limit. The proposed job shop scheduling algorithm shows better performance than tabu search, simulated annealing and genetic algorithm, and error rates compared to optimal solution is low. The batch splitting algorithm shows that only a few split can improve schedule considerably, and we can handle dynamic events more elegantly by this algorithm. 
c PhD 

Downlaod :

번호 c year 제목 author
35 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang 
34 MS  2004  A Design on Cost-Estimation Support System for Injection Mold Using AI Method [12] Gunhee Kim 
33 MS  2004  A study on due-date assignment method in wafer fabrication facility producing multiple product types [3] Jaewon Park 
32 MS  2005  A Study on RFID application in Reverse Supply Chain [3] Dongjoon Lim 
31 MS  2005  Development of Reference Model and Strategic Road Map for the Implementation of a Reverse Supply Chain [183] Chihoon Lim 
30 MS  2005  A Study on Developing of Position collecting Vision system Using Marker [1] Jiyoon Park 
29 MS  2005  A Study on Product Development Methodology in Reverse Supply Chain [77] Joon Kim 
28 MS  2006  A Study on the Application of Group Technology for Naval Ship Design And Manufacturing: Relating to Platform Family Architecture [17] Gwangjae Park 
27 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
26 MS  2006  A Study on the Assessment Method of Installation and Operation Cost in a Reverse Supply Chain [2] file Hyunjong Jeong 
25 MS  2007  A Study on the Valuation of a Supply Chain Considering Management Efficiency and Environmental Effect [53] Jiyoun Kim 
24 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
23 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
22 MS  2009  A Study on Integrated Risk Management in Supply Chain - Focusing on High-tech Electronic Industry [52] file Kanghyun Kim 
21 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
20 MS  2009  A Study on the Economic Feasibility of Automated Identification Technology on the ELV Management Process [25] file Kiheon Nam 
19 MS  2007  A Study on Project Risk Management based on Earned Value Management [25] file Hyunil Noh 
18 MS  2007  A Study on BOM for Enhancing Efficiency of Reverse Supply Chain [14] Jinseon Yoo 
17 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
16 MS  2007  A Simulation Study on the Impact of RFID Technology on the Supply Chain Counting Process [13] file Jangwon Cho 
15 MS  2008  A study on supplier's performance measurements for a supply chain on a new product environment [1] Jungsub Lee 
14 MS  2008  Integration of RFID and Web Service Technology in Manufacturing Systems [20] file Gunnam Ong 
13 MS  2011  A Study on RMC Scheduling using Simulation [19] Jeongho Park 
12 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
11 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
10 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
9 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
8 MS  2012  The study on target allocation model using simulation for counter-fire execution [22] Jeonghun Kim 
7 MS  2012  Flight and Maintenance Planning of Miliary Aircraft considering Preventive Maintenance Period [13] Jun-Ho Park 
6 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
5 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
4 MS  2013  Design of an inspection system for reducing quality deterioration under VMI supply chain management system [16] Jaebong Lee 
3 MS  2013  Developing integrated key performance indicators and measurement scheme for MES [19] file Gyusun Hwang 
2 MS  2014  A study on operational models for electric vehicle battery switch stations in smart grid environment Dong Hyun Kim 
1 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun