Research

year 1997 
author Kidong Kim 
Keyword Integrated Manufacturing System, Process Planning, Scheduling, AND/OR Graph, Branch and Bound 
Abstract In most manufacturing environment, manufacturing activities can be classified into two main domains. One is the domain of manufacturing technology and the other is the domain of manufacturing planning and control. Design, process planning, and manufacturing activities belong to the former, and MPS, MRP and scheduling belong to the latter. Traditionally, activities of the above two domains were performed separately. However, they should be integrated to make manufacturing systems more efficient.

In this thesis, we endeavor to integrate the process planning and scheduling activities as an attempt to integrate the two realms which traditionally had been treated separately. To draw up a plan of process planning and scheduling in real manufacturing environment is not an easy task because available time to plan could be limited and the shop status could change frequently. So we propose an architecture of integrated process planning and scheduling system which can settle the integrated process planning and scheduling problem within the allowed time even if shop situations change rather frequently. Also we propose solution algorithms for the problems derived by the system.

The inputs to the proposed system (named as IPPSS, Integrated Process Planning and Scheduling System) are the shop status, the information about orders, the allowed time for the plan, and the AND/OR graph which represents the process plan of part. The IPPSS is composed of three main modules and one supplementary module. The main modules, which are directly related to process planning and scheduling are the emergency module, the iterative module, and the integrated module. The supplementary module can convert the data used in the integrated system to EXPRESS language and vice versa. Each of these three main modules can generate solution but the quality of solution from the integration module is better - i.e. more optimum - than iterative module, and also the iterative module better than from emergency module, etc. However the time to get solutions gets longer in reverse order. One of three main modules is selected based on the allowed time for the plan in this proposed system so that we can always plan the best solution for each condition.

The emergency module solves the process planning and scheduling problem one by one. In this module, the AND/OR graph is modified to ´AND/OR graph with time window´. And then, an algorithm which finds the shortest path from the start node to terminal node is applied to the ´AND/OR graph with time window´.

The iterative module generates the process plan and the schedule sequentially and fixes the process plan after verifying the performance of the schedule using simulation study. In this module, the process plan is generated by selecting the operations to be performed and the machines to manufacture parts with the objective of balancing the weighted load. And then, a simulation study is performed using dispatching rules and the makespan is determined from the result of the simulation study. The checking procedure checks the terminating condition and updates the weights of the machines if necessary. These procedures of process planning, simulation, and checking are repeated until the terminating condition is met. The process planning procedure uses branch and bound method, and the Lagrangian relaxation method is used to find the lower bounds.

In the integrated module, the optimal solution of the process planning and scheduling is made. The branch and bound algorithm is used and the branching strategy is concretely related with the problem structure. The experimental results of the proposed system are also included. 
c PhD 

Download :

번호 c year 제목 author
35 MS  1994  A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation [1] Kitae Kim 
34 MS  1990  A Study on Data Allocation Problems for Distributed Database Design [2] Kitae Shin 
33 MS  2011  A Study on Real Time Progress Monitoring Methodology and Effects based on RTLS in Project Shop [27] Kyounghwi Tae 
32 MS  1995  An Object-Oriented Framework for the Implementation of Distributed Shop Floor Control in FMS [2] Kyungsuk Lee 
31 MS  2011  The Development of a Strategic Model of Freight Transportation between Korea and Europe [525] Louis Coulet 
30 MS  2006  A Framework for the ubiquitous MES using RFID and Web services Technology [25] Manchul Han 
29 MS  2004  A Study on Reverse Supply Chain of End of Life Vehicle for the Enhanced Recycle Performance [6] Miyeon Ryu 
28 MS  2004  A Study on Extended Workflow Model Considering Activity Based Costing [27] Moontae Hwang 
27 MS  2001  A Study of Decision Support for the implementation of Cellular Manufacturing Systems. [1] Muynghee Byun 
26 MS  2007  A Study on Utility Value and Fairness of Information Sharing in Supply Chain [18] file Myongran Oh 
25 MS  1995  A study on Real-Time Collection of Shop Floor Data Using Speech Recognition [2] Namjoo Kim 
24 MS  1988  Development of a Classification and Coding System through Fuzzy Sets Approach [1] Namkyu Park 
23 MS  1991  A Study on Performance Evaluation of Production Plan for FMS Using Queueing Network [1] Sangbok Woo 
22 MS  1997  A New Approach to Master Production Scheduling in the MRP environment [1] Sangdo Choi 
21 MS  1993  A Supervisory Control Approach to Rapid Implementation of Low-Level Control Software for FMC [1] Sangkyun Kim 
20 MS  1995  A study on intelligent dispatching strategy in Automated Manufacturing Systems [5] Seongwoo Lee 
19 MS  1999  A Study on the Development of Event-driven MRP Components Considering Capacity Constraints [1] Seunghyun Yoon 
18 MS  1998  A Study on UML representation of CIM-OSA and availability of analysis and design pattern in CIM-OSA [1] Seungoh Han 
17 MS  1995  A Study on knowledge Acquisition for Simulation-based Scheduling Expert System [1] Soohyun Lee 
16 MS  2011  Intelligent service during middle-of-life phase of a product: Illustration of framework and its evaluation model [3] Soyeon Yoon 
15 MS  1992  A Study on Production Planning Problems in a Flexible Machining and Assembly System [1] Sukang Lee 
14 MS  2014  A hybrid algorithm for production scheduling under Make-to-Order environment : a case study from the transformer industry Sung Bum Jun 
13 MS  1993  A Study on the Computer-Aided Process Planning for Rotational Parts Considering Machine Status [1] Sungbum Chun 
12 MS  2008  An Study abou the Application and Effect of RFID Technology in the Activity Collecting Information to Improvement of Manufacturing Process [10] Sungho Jo 
11 MS  2012  Load Leveling in Project Scheduling Using Partial Adjustment and Diffusional Relaxation Method [12] SungHoon KIM 
10 MS  2012  Load Leveling in Project Scheduling Considering Work-in-Process Inventory [18] Sungjin Lee 
9 MS  2000  Design of a Hybrid System in Integrating Kanban with MRP [2] Taeyoung Song 
8 MS  1996  A Study on the Generation and DB Construction of Modular BOM [1] Yonggu Ji 
7 MS  1990  A Fuzzy Linguistic Approach to the Part Selection Problem in FMS [1] Yoosuk Hong 
6 MS  2002  Design and Implementation of Model Management System for Supply Chain Planning [1] Youngcheol Yang 
5 MS  2009  A Study on Mine Artillery Hit Using Simulation [3] Youngho Chung 
4 MS  2011  A System Study to Improve the Infromation Flow of Unused Drug Recovery After Customer Point Reach in Pharmaceutical Reverse Logistics [2] Youngjee Hong 
3 MS  1992  A Decision Support System for A Machine Specifications in Design of An FMS [6] Youngkwan Ko 
2 MS  2009  A Fuzzy-AHP based Decision making Model for ground operations [37] Youngkyun Lee 
1 MS  2004  A Study on business process model for extended and integrated supply chain planning : Focused on negotiation [5] Yuncheol Kang