27 |
2011
A CSP-based Load Leveling Algorithm for Ship Block Erection Network
|
황규선 |
26 |
2011
Object Process Methodology for Manufacturing Execution System based on International Standard
|
황규선 |
25 |
2011
프로젝트 제안 PPT
|
황규선 |
24 |
2011
Auditing the manufacturing system using IT governance tools
|
황규선 |
23 |
2011
A study on the number of Pallets in RMC
|
한수민 |
22 |
2011
topics related to VRP
|
한수민 |
21 |
2011
empowerment scheduling for field workforce
|
한수민 |
20 |
2011
Lean-pull strategy in a re-entrant manufacturing environment
|
이재봉 |
19 |
2011
Operational and environmental performence measures in CLSC
|
이재봉 |
18 |
2011
Vehicle Routing Problem
|
이성진 |
17 |
2011
Reducing the Level of the Waiting Blocks in the Shipbuilding Industry by Using the Theory of Constraints
|
이성진 |
16 |
2011
Load Leveling in shipyard(비공개)
|
서진우 |
15 |
2011
Developing Practical Machine Scheduler(비공개)
|
서진우 |
14 |
2011
Development of practical machine scheduler in worker-involved reconfigurable manufacturing cell(비공개)
|
서진우 |
13 |
2011
RFID in product lifecycle management : a case in the automotive industry
|
박준호 |
12 |
2011
Scheduling preventive maintenance for aircraft engine
|
박준호 |
» |
2011
Flight and Maintenance Planning of Military Aircraft
|
박준호 |
10 |
2011
Flight and Maintenance Planning of Military Aircraft
|
박준호 |
9 |
2011
군용 항공기 일일 비행임무 계획을 위한 항공기 할당 문제
|
박준호 |
8 |
2011
A modeling framework for facility location problem
|
김정훈 |