lab sem test
Date : 2008-04-18 
작성인 : 정영호 
Key Words : RFID, 공공분야 시범 및 확산사업 

Download : 

List of Articles
번호 제목 작성인sort

~2010 Achieving Supply Chain Agility file

작성인 김영우 

~2010 ADSCP framework for 3PL partnership file

작성인 김영우 

~2010 시뮬레이션학회발표준비

작성인 김영우 

~2010 Design of Closed-loop Supply Chain file

작성인 김영우 

~2010 Flexible VRP in Reverse Logistics file

작성인 김영우 

~2010 RFID-based Reverse Logistics System file

작성인 김영우 

~2010 Software Productivity and Its Prediction file

작성인 김영우 

~2010 Software Development Effort Estimation Considering Complexity using Radial Basis Function Network(working paper)

작성인 김영우 

~2010 2010 Software Costing Standard file

작성인 김영우 

2011 A Model for Coordinated Closed-loop Supply Chain

작성인 김영우 

2011 Legislation Analysis for Closed-loop Supply Network file

작성인 김영우 

2011 Centralized Fleet Management System for Automated Transportation System file

작성인 김영우 

2012 Decision Support System for Multi-loop Recovery Using Recycle Bill file

작성인 김영우 

2012 Designing data system for remanufacturing with radio frequency identification technology file

작성인 김영우 

2012 Developing a Production Planning Model for Closed-loop Manufacturing System file

작성인 김영우 

2014 Application of UHF Class 1 Gen 2 Tags to the RFID-based Reverse Logistics System file

작성인 김영우 

2015 A Framework for the RFID-based Vehicle Lifecycle Information Data System towards the Internet-of-Things file

작성인 김영우 

~2010 simulation framework for small scale engagement file

작성인 김정훈 

2011 A modeling framework for facility location problem

작성인 김정훈 

~2010 Outbound supply chain network design file

작성인 김지연 

2012 Path Selection Model and Algorithm for Emergency Logistics Management file

작성인 김한국 

2012 Enterprise integration and interoperability in manufacturing systems file

작성인 김한국 

2012 재공 재고 요소를 고려한 부하평준화 스케줄링

작성인 김한국 

~2010 Manufacturing & Cost accounting (2) Cost accounting 중심 file

작성인 김해중 

~2010 GECCO 2006 발표 file

작성인 김해중 

~2010 ntegrated Models for Production Planning and Scheduling (1) file

작성인 김해중 

~2010 Integrated Models for Production Planning and Scheduling in Supply Chain (2)

작성인 김해중 

~2010 Supply chain strategy considering system structure and dynamics file

작성인 김해중 

~2010 Simultaneous lot sizing and scheduling by batch sequencing file

작성인 김해중 

~2010 Analyzing and Improving the Supply Chain using System Dynamics Simulation file

작성인 김해중 

2014 과학적관리의 원칙과 TOC

작성인 김현준 

2014 Operational and Setup model for EV battery switch stations

작성인 김현준 

2014 전기 자동차 보급 활성화를 위한 관련 정책 연구

작성인 김현준 

~2010 A New Approach for Finite Capacity Planning in MRP Environment file

작성인 나홍범 

~2010 A New Approach for Finite Capacity Planning in MRP Environment 2 file

작성인 나홍범 

~2010 APMS Conference - A New Approach for Finite Capacity Planning in MRP Environment file

작성인 나홍범 

~2010 Integrated data structure of Bill of Material and Routing file

작성인 나홍범 

~2010 ER Models for MRP Process file

작성인 나홍범 

~2010 Finite capacity planning file

작성인 나홍범 

~2010 Finite capacity scheduling file

작성인 나홍범