로그인
한국어
English
Home
About
-
About MAI LAB
-
SNUGANTT
-
영상처리를 이용한 작업측정 시스템
Lecture
-
Scientific Management
-
CIMS
-
ERP
-
Scheduling
Research
-
Research Area
-
Lab Seminar
-
Publications
Journal
Conference
-
Thesis
-
Project
-
Lab. Sem. Archive
-
ERP
Members
-
Professor
-
Alumni
-
Lab. Members
Gallery
Contact Us
LOGIN
로그인 유지
로그인
한국어
- English
검색
Home
About
About MAI LAB
SNUGANTT
영상처리를 이용한 작업측정 시스템
Lecture
Scientific Management
CIMS
ERP
Scheduling
Research
Research Area
Lab Seminar
Publications
Journal
Conference
Thesis
Project
Lab. Sem. Archive
ERP
Members
Professor
Alumni
Lab. Members
Gallery
Contact Us
Research
Home
/
Research
/
Lab. Sem. Archive
CATEGORY
Research Area
Lab Seminar
Publications
Thesis
Project
Lab. Sem. Archive
ERP
lab sem test
글 수
326
Classic Style
Zine Style
Gallery Style
A farsighted index scheduling method for flexible job shop environment with multi-level product structure
~2010
조회 수
683
추천 수
0
2015.08.03 14:54:15
ultra_admin
*.46.199.202
http://mailab.snu.ac.kr/index.php?document_srl=3163
Date :
2010/01/14
작성인 :
나홍범
Key Words :
Index-based scheduling, Flexilbe job shop, multi-level product structure
Download :
20100114_nhb.zip
이 게시물을
첨부 (1)
20100114_nhb.zip
[File Size:249.6KB/Download:0]
엮인글 :
http://mailab.snu.ac.kr/index.php?mid=board_XSUi70&document_srl=3163&act=trackback&key=c06
목록
List of Articles
번호
분류
~2010 (223)
2011 (27)
2012 (29)
2013 (21)
2014 (18)
2015 (7)
2017 (1)
Go
제목
작성인
86
~2010
ER Models for MRP Process
나홍범
85
~2010
Finite capacity planning
나홍범
84
~2010
Finite capacity scheduling
나홍범
83
~2010
Designing Product Platform for Efficient Production Planning Process
나홍범
82
~2010
산업별 특징에 따른 스케줄링 소프트웨어 개발에 관한 연구
나홍범
81
~2010
Designing Product Platform for Efficient Production Planning Process
나홍범
80
~2010
product architecture assessment
나홍범
79
~2010
Issues on product platform architecture development
나홍범
78
~2010
Product platform in automotive industry
나홍범
77
~2010
Generation and evaluation of prdoduction oriented product platform
나홍범
76
~2010
제조공정의 특징에 따른 우선순위규칙 기반의 스케줄링 (정밀공학회)
나홍범
75
~2010
A NEW SCHEDULING PARADIGM BASED ON FARSIGHTED INDEX (ICPR 2009)
나홍범
»
~2010
A farsighted index scheduling method for flexible job shop environment with multi-level product structure
나홍범
73
2014
과학적관리의 원칙과 TOC
김현준
72
2014
Operational and Setup model for EV battery switch stations
김현준
71
2014
전기 자동차 보급 활성화를 위한 관련 정책 연구
김현준
70
~2010
Manufacturing & Cost accounting (2) Cost accounting 중심
김해중
69
~2010
GECCO 2006 발표
김해중
68
~2010
ntegrated Models for Production Planning and Scheduling (1)
김해중
67
~2010
Integrated Models for Production Planning and Scheduling in Supply Chain (2)
김해중
66
~2010
Supply chain strategy considering system structure and dynamics
김해중
65
~2010
Simultaneous lot sizing and scheduling by batch sequencing
김해중
64
~2010
Analyzing and Improving the Supply Chain using System Dynamics Simulation
김해중
63
2012
Path Selection Model and Algorithm for Emergency Logistics Management
김한국
62
2012
Enterprise integration and interoperability in manufacturing systems
김한국
61
2012
재공 재고 요소를 고려한 부하평준화 스케줄링
김한국
60
~2010
Outbound supply chain network design
김지연
59
~2010
simulation framework for small scale engagement
김정훈
58
2011
A modeling framework for facility location problem
김정훈
57
~2010
Achieving Supply Chain Agility
김영우
56
~2010
ADSCP framework for 3PL partnership
김영우
55
~2010
시뮬레이션학회발표준비
김영우
54
~2010
Design of Closed-loop Supply Chain
김영우
53
~2010
Flexible VRP in Reverse Logistics
김영우
52
~2010
RFID-based Reverse Logistics System
김영우
51
~2010
Software Productivity and Its Prediction
김영우
50
~2010
Software Development Effort Estimation Considering Complexity using Radial Basis Function Network(working paper)
김영우
49
~2010
2010 Software Costing Standard
김영우
48
2011
A Model for Coordinated Closed-loop Supply Chain
김영우
47
2011
Legislation Analysis for Closed-loop Supply Network
김영우
쓰기
목록
첫 페이지
2
3
4
5
6
7
8
9
끝 페이지
Board Search
제목+내용
제목
내용
댓글
이름
닉네임
아이디
태그
Key Words
검색
Contributors
Tag List