123 |
~2010
제조 기업의 판매주문관리에서의 대응성 향상 방안
|
박목민 |
122 |
~2010
Gauge-changeable system for the Northeast Asian Railway Network
|
박정준 |
121 |
~2010
Scheduling trains as a blocking parallel-machine job shop scheduling problem
|
박정준 |
120 |
~2010
An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
|
박정호 |
119 |
~2010
Controlling inventories with stochastic item returns_ A basic model
|
박정호 |
118 |
~2010
A stochastic approach to a case study for product
|
박정호 |
117 |
~2010
FMS Real-time scheduling Method
|
박정호 |
116 |
~2010
Reconfigurable manufacturing systems the state of the art
|
박정호 |
115 |
~2010
한국의 국제 복합 일관 수송 현황과 개선방안_ 3PL 철도 화물을 중심으로
|
박정호 |
114 |
~2010
Joint Optimisation of Spare Part Inventory, Maintenance Frequency and Repair Capacity for k-out-of-N Systems
|
박준호 |
113 |
~2010
Aircraft availability Scheduling preventive maintenance Sorties Allocation OR in military
|
박준호 |
112 |
~2010
로제타넷 최근동향
|
서진우 |
111 |
~2010
Coodinating dispatching rule을 이용한 Job Shop schedule의 성능 개선
|
서진우 |
110 |
~2010
화이트칼라 작업장에서 작업 효율 개선 - 다중 모니터 사용을 중심으로
|
서진우 |
109 |
~2010
화이트 칼라 작업장에서 작업 효율 측정 및 개선 : 컴퓨터 작업을 중심으로
|
서진우 |
108 |
~2010
컴퓨터 화면이 지식노동자 생산성에 미치는 영향과 그 대안 - 하이라이트(비공개)
|
서진우 |
107 |
~2010
긴급수송과 외부 용차를 고려한 허브-스포크 네트워크의 설계
|
서진우 |
106 |
~2010
A holonic approach to dynamic manufacturing scheduling
|
서진우 |
105 |
~2010
Ranking Dispatching Rules by Data Envelopment Analysis
|
서진우 |
104 |
~2010
Business Process Management and Petri nets
|
서진우 |