Download : 20110307_kyw.ppt
2011 Project selection and scheduling with completion time dependent returns
작성인 김성훈
2011 My research direction in project scheduling
2011 Resource leveling problem
2011 The algorithm for resource leveling
2011 A Model for Coordinated Closed-loop Supply Chain
작성인 김영우
2011 Legislation Analysis for Closed-loop Supply Network
2011 Centralized Fleet Management System for Automated Transportation System
2011 A modeling framework for facility location problem
작성인 김정훈
2011 RFID in product lifecycle management : a case in the automotive industry
작성인 박준호
2011 Scheduling preventive maintenance for aircraft engine
2011 Flight and Maintenance Planning of Military Aircraft
2011 군용 항공기 일일 비행임무 계획을 위한 항공기 할당 문제
2011 Load Leveling in shipyard(비공개)
작성인 서진우
2011 Developing Practical Machine Scheduler(비공개)
2011 Development of practical machine scheduler in worker-involved reconfigurable manufacturing cell(비공개)
2011 Vehicle Routing Problem
작성인 이성진
2011 Reducing the Level of the Waiting Blocks in the Shipbuilding Industry by Using the Theory of Constraints
2011 Lean-pull strategy in a re-entrant manufacturing environment
작성인 이재봉
2011 Operational and environmental performence measures in CLSC