Download : 20090826_pjj.ppt
~2010 Scheduling in Assembly Jobshop
작성인 서진우
~2010 RMC Scheduling
~2010 Software Productivity: research survey
~2010 스케줄링에서 변동예측 기술의 활용
~2010 How to reschedule - 논문 아이디어 (비공개)
~2010 Multi-dimensional Knapsack Problem using GA
2011 Load Leveling in shipyard(비공개)
2011 Developing Practical Machine Scheduler(비공개)
2011 Development of practical machine scheduler in worker-involved reconfigurable manufacturing cell(비공개)
2012 Scheduling in RMC: An integrative approach (on going research)
2012 Reconfigurable Manufacturing Cell : Import Justification
2012 Reconfigurable Mfg. Cell:Algotirhm&performance
2013 조선 프로젝트 계약 방식에 착안한 SW 프로젝트 계약 방식 제안
2013 Reconfigurable Mfg. Cell:Algotirhm&performance
2013 Reconfigurable Mfg. Cell: Preparation for dissertation examination
2014 산학프로젝트 발표
2011 RFID in product lifecycle management : a case in the automotive industry
작성인 박준호
~2010 Joint Optimisation of Spare Part Inventory, Maintenance Frequency and Repair Capacity for k-out-of-N Systems
~2010 Aircraft availability Scheduling preventive maintenance Sorties Allocation OR in military
2011 Scheduling preventive maintenance for aircraft engine
2011 Flight and Maintenance Planning of Military Aircraft
2011 군용 항공기 일일 비행임무 계획을 위한 항공기 할당 문제
~2010 An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
작성인 박정호
~2010 Controlling inventories with stochastic item returns_ A basic model
~2010 A stochastic approach to a case study for product
~2010 FMS Real-time scheduling Method
~2010 Reconfigurable manufacturing systems the state of the art
~2010 한국의 국제 복합 일관 수송 현황과 개선방안_ 3PL 철도 화물을 중심으로
~2010 Gauge-changeable system for the Northeast Asian Railway Network
작성인 박정준
~2010 Scheduling trains as a blocking parallel-machine job shop scheduling problem
~2010 Assembly Line Balancing
작성인 박목민
~2010 Assembly System Design
~2010 Object Motion Detection using RFID & Mercury Switch
~2010 Production Scheduling under Uncertainties
~2010 Dynamic Scheduling Problem
~2010 Order Promising Problem
~2010 Order Promising