author Yangja Jang 
2nd author /Seongyoung Jang (Dept. of Industrial Engineering, Seoul National University)
/ Kidong Kim (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
info The Japan Society of Mechanical Engineers International Journal (SCI, 0.386), Vol. 46, No. 1, pp.33-38, 2003 
year 2003 
c IJ 
저널/학회 JSME 
group SCI 
keyword Flexible Job shop, Multi-level Job, Genetic Algorithm, Relative Operation Level 
abstract This paper deals with a scheduling problem in a flexible job shop with multi-level job structures where end products are assembled from sub-assemblies or manufactured components. For such shops MRP(Material Requirement Planning)
logic is frequently used to synchronize and pace the production activities for the required parts. However, in MRP, the planning of operational-level activities is left to short term scheduling. So, we need a good scheduling algorithm to generate feasible schedules taking into account shop floor characteristics and multi-level job structures used in MRP. In this paper, we present a GA(Genetic Algorithm) solution for this complex scheduling problem based on a new gene to reflect the machine assignment, operation sequences and the levels of the operations relative to final assembly operation. The relative operation level is the control parameter that paces the completion timing of the components belonging to the same branch in the multi-level job hierarchy. We compare the genetic algorithm with several dispatching rules in terms of total tardiness and the genetic algorithm shows outstanding performance for about forty modified standard job-shop problem instances. 
번호 c 저널/학회 group 제목 author year
19 IJ  JESTC    Management of Address Information to Improve Quality of Customer Contact file Tai-Woo Chang  2004 
18 DJ  IE Interfaces    GIS를 이용한 우편주소정보관리시스템 file Tai-Woo Chang  2005 
17 DJ  DJ 전자거래    e-비즈니스 통합을 위한 시맨틱 웹의 활용 file Tai-Woo Chang  2005 
16 IJ  C&IE  SCIE  A combined model network design and production/distribution planning for a supply network file Yangja Jang  2002 
» IJ  JSME  SCI  Flexible Job Shop Scheduling with Multi-level Job Structures file Yangja Jang  2003 
14 DJ  산업공학    컨테이너 터미널의 자원 할당계획에 관한 연구 file Yangja Jang  2002 
13 DJ  산업공학    Value Clustering Method를 통한 Modular BOM의 생성과 데이터베이스의 효율적인 구축에 관한 연구 file Yonggu Ji  1998 
12 IJ  C&OR  SCIE  Optimal Reorder Decision Utilizing Centralized Stock information in a two-echelon distribution system file Yongwon Seo  2002 
11 DJ  IE Interfaces    2계층 분배형 공급사슬에서 실시간 공유 재고 정보의 가치에 관한 연구 file Yongwon Seo  2000 
10 IJ  Sustainability  SCIE  Gen2 RFID-based System Framework for Resource Circulation in Closed-loop Supply Chain Young-woo Kim  2017 
9 DJ  IE Interfaces    유연한 공급망 계획 모형 작성을 위한 모형관리자의 설계 및 구현 file Youngcheol Yang  2002 
8 DJ  MORSK    RFID를 이용한 국방 비밀관리시스템 발전방안에 관한 연구 Youngho Chung  2007 
7 DJ  시뮬레이션    DEVS을 이용한 갱도포병 타격에 관한 연구 Youngho Chung  2008 
6 DJ  시뮬레이션    갱도 포병 타격시 무인항공기 운용 효과에 관한 연구 Youngho Chung  2008 
5 IJ  ICICEL  SCOPUS  Reverse logistics with data-driven drug recovery model Youngjee Hong  2013 
4 DJ  경영과학    RFID 기술을 이용한 실시간 공급망 모형 구축/Development of a real-time supply chain model using RFID technology file Youngjee Hong  2010 
3 DJ  시뮬레이션    지상작전수립을 위한 Fuzzy-AHP 기반의 의사결정 모델 연구 Youngkyun Lee  2008 
2 DJ  전자거래    확장,통합된 공급사슬계획에서 협상을 위한 비즈니스 프로세스 모델에 관한 연구 Yuncheol Kang  2004 
1 DJ  한국경영과학회지    재난 현장의 구호 자원 운송 차량 경로에 관한 연구 한수민  2016