author Dosung Go 
2nd author Youngcheol Yang
Yangja Jang 
info IE Interfaces, Vol. 13, No. 3, pp.378-387, 2000 
year 2000 
c DJ 
저널/학회 IE Interfaces 
group  
keyword  
abstract As the globalization of manufacturing companies continues, the scope of dependence between these companies and distributors, and other suppliers are growing very rapidly since no one company manufactures or distributes the whole product by themselves. And, the need to increase the efficiency of the whole supply chain is increasing. This paper deals with a multi-plant lot-sizing problem(MPLSP) which happens in a decentralized manufacturing system of a supply chain. In this study, we assume that the whole supply chain is driven by a single source of independent demand and many levels of dependent demands among manufacturing systems in the supply chain. We consider setup cost, transportation cost and time, and inventory holding cost as a decision factor in the MPLSP. The MPLSP is decomposed into two sub-problems: a planning problem of the whole supply chain and a lot-sizing problem of each manufacturing system. The supply chain planning problem becomes a pure linear programming problem and a Generalized Goal Decomposition method is used to solve the problem. Its result is used as a goal of the lot-sizing problem. The lot-sizing problem is solved using the CPLEX package, and then the coefficients of the planning problem are updated reflecting the lot-sizing solution. This procedure is repeated until termination criteria are met. The whole solution process is similar to Lagrangian relaxation method in the sense that the solutions are approaching the optimum in a recursive manner. Through experiments, the proposed closed-loop hierarchical planning and traditional hierarchical planning are compared to optimal solution, and it is shown that the proposed method is a very viable alternative for solving production planning problems of decentralized manufacturing systems and in other areas. 
번호 c 저널/학회 group 제목 author year
19 IJ  LNICST    Paris Metro Pricing for Internet Service Differentiation file Dongmyung Lee  2011 
18 IJ  ICICEL  SCOPUS  Evaluation of intelligent service system for the middle-of-life product file Soyeon Yoon  2012 
17 IJ  IJAMT  SCIE  A solution procedure for integrated supply chain planning problem in open business environment file Jinwu Seo  2012 
16 IJ  IEEE JSAC  SCI  Price of Simplicity under Congestion file Dongmyung Lee  2012 
15 IJ  IJAMT  SCIE  Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficency file Joonyung Moon  2013 
14 IJ  ICICEL  SCOPUS  Reverse logistics with data-driven drug recovery model Youngjee Hong  2013 
13 IJ  IMDS  SCIE  Determining business models in bottom-of-the-pyramid markets Sungbum Jun  2013 
12 IJ  IJPR  SCI  Multi-level job scheduling in a flexible job shop environment file Hongbum Na  2013 
11 IJ  IJPR  SCI  Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage file Joonyung Moon  2014 
10 IJ  IJETR    A study on the effective disaster resources assessment and allocation for emergency response file Sumin Han  2014 
9 IJ  LNAI  SCOPUS  Reorder decision system based on the concept of the order risk using neural networks file Sungwon Jung  2005 
8 IJ  LNAI  SCOPUS  Vendor Managed Inventory and its value in the various supply chain file Sungwon Jung  2005 
7 IJ  LNCS  SCIE  An Automated Blowing Control System Using the Hybrid Concept of Case Based Reasoning and Neural Networks in Steel Industry file Jonghan Kim  2005 
6 IJ  IJPE  SCIE  A new approach to job shop scheduling problems with due date constraints considering operation subcontracts file Daeyoung Chung  2005 
5 IJ  IJAMT  SCIE  Efficient work measurement system of manufacturing cells using speech recognition and digital image processing technology file Eoksu Sim  2006 
4 IJ  ESWA  SCIE  A hybrid genetic algorithm for the hybrid flow shop scheduling problem with nighttime work and simultaneous work constraints file Sungbum Jun  2015 
3 IJ  IJPR  SCI  Developing performance measurement system for Internet of Things and smart factory environment file Gyusun Hwang  2016 
2 IJ  IMDS  SCIE  A supply chain performance measurement approach using the internet of things: Toward more practical SCPMS file Abdallah Jamal Dweekat  2017 
1 IJ  Sustainability  SCIE  Gen2 RFID-based System Framework for Resource Circulation in Closed-loop Supply Chain Young-woo Kim  2017