author Dosung Go 
2nd author Youngcheol Yang
Yangja Jang 
info IE Interfaces, Vol. 13, No. 3, pp.378-387, 2000 
year 2000 
c DJ 
저널/학회 IE Interfaces 
group  
keyword  
abstract As the globalization of manufacturing companies continues, the scope of dependence between these companies and distributors, and other suppliers are growing very rapidly since no one company manufactures or distributes the whole product by themselves. And, the need to increase the efficiency of the whole supply chain is increasing. This paper deals with a multi-plant lot-sizing problem(MPLSP) which happens in a decentralized manufacturing system of a supply chain. In this study, we assume that the whole supply chain is driven by a single source of independent demand and many levels of dependent demands among manufacturing systems in the supply chain. We consider setup cost, transportation cost and time, and inventory holding cost as a decision factor in the MPLSP. The MPLSP is decomposed into two sub-problems: a planning problem of the whole supply chain and a lot-sizing problem of each manufacturing system. The supply chain planning problem becomes a pure linear programming problem and a Generalized Goal Decomposition method is used to solve the problem. Its result is used as a goal of the lot-sizing problem. The lot-sizing problem is solved using the CPLEX package, and then the coefficients of the planning problem are updated reflecting the lot-sizing solution. This procedure is repeated until termination criteria are met. The whole solution process is similar to Lagrangian relaxation method in the sense that the solutions are approaching the optimum in a recursive manner. Through experiments, the proposed closed-loop hierarchical planning and traditional hierarchical planning are compared to optimal solution, and it is shown that the proposed method is a very viable alternative for solving production planning problems of decentralized manufacturing systems and in other areas. 
번호 c 저널/학회 group 제목 author year
19 IJ  IJAMT  SCIE  A solution procedure for integrated supply chain planning problem in open business environment file Jinwu Seo  2012 
18 IJ  IEEE JSAC  SCI  Price of Simplicity under Congestion file Dongmyung Lee  2012 
17 DJ  정밀공학    재구성형 모듈러셀의 팔레트-치구 할당: 통합적 접근 file Sumin Han  2012 
16 DJ  EJIT    개방형비즈니스환경에서 수익최대화를 위하여 상하방향협상을 고려한 통합된 공급사슬계획에 관한 연구 file Hanil Jeong  2012 
15 DJ  전자거래    스마트 그리드 환경의 전력소매시장을 위한 최적의 실시간 가격결정 모형에 대한 연구 file Joonyung Moon  2012 
14 IJ  IJAMT  SCIE  Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficency file Joonyung Moon  2013 
13 IJ  ICICEL  SCOPUS  Reverse logistics with data-driven drug recovery model Youngjee Hong  2013 
12 IJ  IMDS  SCIE  Determining business models in bottom-of-the-pyramid markets Sungbum Jun  2013 
11 IJ  IJPR  SCI  Multi-level job scheduling in a flexible job shop environment file Hongbum Na  2013 
10 IJ  IJPR  SCI  Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage file Joonyung Moon  2014 
9 IJ  IJETR    A study on the effective disaster resources assessment and allocation for emergency response file Sumin Han  2014 
8 DJ  한국방재학회지    통계적 기법을 활용한 피해대응자원 분류 알고리즘의 연구 file Sumin Han  2014 
7 IJ  ESWA  SCIE  A hybrid genetic algorithm for the hybrid flow shop scheduling problem with nighttime work and simultaneous work constraints file Sungbum Jun  2015 
6 DJ  한국경영과학회지    재난 현장의 구호 자원 운송 차량 경로에 관한 연구 한수민  2016 
5 DJ  한국방재학회지    사물인터넷을 활용한 돌발 상황 대응 단계에서의 피해복구 자원 활용 계획 수립 시스템 개발 file Gyusun Hwang  2016 
4 IJ  IJPR  SCI  Developing performance measurement system for Internet of Things and smart factory environment file Gyusun Hwang  2016 
3 DJ  한국전자거래학회지    주요 제조업의 사물인터넷 활용성 분석 file Gyusun Hwang  2016 
2 IJ  IMDS  SCIE  A supply chain performance measurement approach using the internet of things: Toward more practical SCPMS file Abdallah Jamal Dweekat  2017 
1 IJ  Sustainability  SCIE  Gen2 RFID-based System Framework for Resource Circulation in Closed-loop Supply Chain Young-woo Kim  2017