2015.07.30 17:22
author | Jonghan Kim |
---|---|
2nd author | / Youngho Kim (Dept. of Industrial Engineering, Seoul National University) / Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) |
presenter | |
info | Date: 2000년 06월 18일 ~ 2000년 06월 21일 City: Seoul Nation: Korea Additional Information: |
year | 2000 |
category | IC |
start / end date | |
city / nation | |
학회 | INFORMS-KORMS |
keywords | Steel Industry, Quality Design, Scheduling, Case-based Reasoning |
abstract | In the steel industry, the quality design and scheduling problems have been handled separately, but these problems are actually interrelated and should be considered simultaneously. This article is a result of such an attempt. We first describe a system architecture for the integration of quality design and scheduling problem. Secondly, the critical processes of case-based reasoning for the quality design problem is presented. Thirdly, we propose algorithms and mathematical formulations for the scheduling problem of steel-making process. Finally, the effectiveness of the proposed approach is demonstrated with some experimental results. |
Download: