author Seunghyun Yoon 
2nd author / Kichang Lee (Dept. of Industrial Engineering, Seoul National University)
/ Chankwon Park (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 06월 18일 ~ 2000년 06월 21일
City: Seoul
Nation: Korea
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 INFORMS-KORMS 
keywords MRP, Capacity Constraint, Dynamic Lead Time, Event-driven, Object-oriented 
abstract The traditional descriptions of MRP system almost always assume time buckets, fixed lead time, and infinite capacity. This research presents new MRP method considering capacity constraints and dynamic lead time. This method uses event-driven approach, which schedules all the operations of a job to finite capacity when an order is entered. It also uses BOMfr(Bill of Manufacture) to integrate BOM, routing, capacity and current order status. For each machine's detailed schedule, JOS(Job oriented scheduling) is used. The prototype system has been developed with COM. Data model is represented with UML(Unified Modeling Language). The system consists of MRP LOGIC COM for the MRP system's logic and MRP DB COM for persistent data storage. The modules developed with COM component show higher reusability and maintainability than traditional object-oriented system. 

Download:

번호 category 학회 제목 author presenter year
95 IC  ICIMSA  Internet of Things-Enabled Supply Chain Performance Measurement Model file Abdallah J. Dweekat  Abdallah J. Dweekat  2016 
94 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
93 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
92 IC  APIEMS  A study on relieving electric power shortage by on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2014 
91 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
90 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
89 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
88 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
87 IC  ICOIN  Analysis of Paris Metro Pricing for Wireless Internet Services Dongmyung Lee    2011 
86 IC  GameNets  Paris Metro Pricing for Internet Service Differentiation Dongmyung Lee    2011 
85 IC  ICQT  A Token Pricing Scheme for Internet Services Dongmyung Lee    2011 
84 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
83 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
82 IC  GECCO  A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm file Eoksu Sim    2004 
81 IC  AsiaSim  Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling file Eoksu Sim    2004 
80 IC  Asian eBiz  Integration of RFID and Web Services Technology in MES Gunnam Ong    2007 
79 IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
78 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
77 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
76 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016