author Hongbum Na 
2nd author  
presenter  
info This conference paper has been presented by Hongbum Na on the International Conference on Production Research. The conference has been held in Stuttgart, Germany, 2011/7/31 ~ 2011/8/4 . 
year 2011 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords FMC scheduling, pallet constraints, transient disturbance, rescheduling method 
abstract When trying to solve a flexible manufacturing cell (FMC) scheduling problem in certain types of industrial situation, not only the routing and sequencing problems but also the availability of pallets and loading/unloading (L/U) stations could be considered. In those situations, scheduling problems are constrained by the number of pallets, pallet operation policies and L/U station conditions because each job requires a setup with different types of pallets, which are performed at L/U stations.
In this study, overall scheduling process and several heuristic algorithms based on priority rules which utilize the information of pallets and L/U stations are introduced to generate good production schedules. The makespans of the machining centers and L/U stations are considered in a hierarchical manner. Considering practical shop environments, several types of transient disturbances such as preventive maintenance and machine breakdown are considered and several rescheduling methods are suggested 

Download :

번호 category 학회 제목 author presenter year
75 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
74 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
73 IC  AsiaSim  A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework Haejoong Kim    2007 
72 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
71 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
70 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
69 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
68 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
67 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
» IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
65 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
64 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
63 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
62 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
61 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
60 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
59 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
58 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
57 IC  AsiaSim  A Study on the Effects of Highlighted Display on Knowledge Worker Productivity Jinwu Seo    2009 
56 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011