author Mokmin Park 
2nd author Kitae Shin
Hanil Jeong
Jinwoo Park 
presenter  
info This conference paper has been presented by Jinwoo Park on the International Conference on Advances in Production Management Systems. The conference has been held in Bordeaux, France, 2009/9/19 ~ 2009/9/23 . 
year 2009 
category IC 
start / end date  
city / nation  
학회 APMS 
keywords responsiveness; due-date assignment; web services technology; ubiquitous computing technology 
abstract This study attempts to enhance the responsiveness of enterprises by adjusting the delivery dates taking into account of the production and delivery schedules in a supply chain. To enhance responsiveness, we suggest a due-date assignment method and re-negotiation process for a sales order processing system. The due-date assignment method is designed with the concept of categorized customers’ priorities and the re-negotiation process is designed with the concept of the partial delivery and due-date delay allowances. Usually, the due-dates have been considered as customer-assigned exogenous parameters or fixed endogenous variables set by manufacturers. However, those are customary in some industries, e.g. semi-conductor manufacturing, that customers often request changes for their delivery dates after placing an order if something unexpected happens. From these observations, we also propose a new
architecture of responsive sales order processing system based on Web Services and Ubiquitous Computing technologies for reliable real-time information. 

Download :

번호 category 학회 제목 author presenter year
55 IC  AsiaSim  A Study on Simulation Model for Yard Layout Planning in Offshore Plant Industry file Kim Hyun Jun  Kim Hyun Jun  2015 
54 IC  AsiaSim  An Economic Analysis on RFID Impact in Supply Chain Kiheon Nam    2008 
53 IC  IFAC on IMS  A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment Kidong Kim    1997 
52 IC  APIEMS  A Study on Developing a Scheduling System in Alternative Routing and Machine Environment Kidong Kim    1999 
51 IC  ICPR  A Scheduling Algorithm considering Subcontract cost in MRP Environment Kichang Lee    1997 
50 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
49 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
48 IC  Asian eBiz  Supplier Responsiveness Metrics for Supplier Selection in a New Product Launch Environment Jungsub Lee    2008 
47 IC  APIEMS  A genetic algorithm based approach for the periodic vehicle routing problem Joon Yung Moon    2009 
46 IC  APMS  Modeling and optimization of unrelated parallel machine scheduling problem with time-dependent and machine-dependent electricity cost Joon Yung Moon    2011 
45 IC  ICARCV  A Discrete Control Approach to Robotic Cell Operating System Design Jonghun Park    1996 
44 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
43 IC  INFORMS-KORMS  Hybrid Algorithms in Integrated Quality Design & Scheduling Jonghan Kim    2000 
42 IC  CIE  Decision support system for preliminary cost estimation with case based reasoning file Jonghan Kim    2004 
41 IC  AsiaSim  A Study on the Effects of Highlighted Display on Knowledge Worker Productivity Jinwu Seo    2009 
40 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
39 IC  AsiaSim  Developing a Practical Machine Scheduler for Worker-Involved Reconfigurable Manufacturing Systems Jinwu Seo    2011 
38 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
37 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
36 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005