author Seunghyun Yoon 
2nd author / Kichang Lee (Dept. of Industrial Engineering, Seoul National University)
/ Chankwon Park (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 06월 18일 ~ 2000년 06월 21일
City: Seoul
Nation: Korea
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 INFORMS-KORMS 
keywords MRP, Capacity Constraint, Dynamic Lead Time, Event-driven, Object-oriented 
abstract The traditional descriptions of MRP system almost always assume time buckets, fixed lead time, and infinite capacity. This research presents new MRP method considering capacity constraints and dynamic lead time. This method uses event-driven approach, which schedules all the operations of a job to finite capacity when an order is entered. It also uses BOMfr(Bill of Manufacture) to integrate BOM, routing, capacity and current order status. For each machine's detailed schedule, JOS(Job oriented scheduling) is used. The prototype system has been developed with COM. Data model is represented with UML(Unified Modeling Language). The system consists of MRP LOGIC COM for the MRP system's logic and MRP DB COM for persistent data storage. The modules developed with COM component show higher reusability and maintainability than traditional object-oriented system. 

Download:

번호 category 학회 제목 author presenter year
35 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
34 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
33 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
32 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
31 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
30 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
29 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
28 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
27 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
26 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
25 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
24 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
23 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
22 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
21 IC  AsiaSim  A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework Haejoong Kim    2007 
20 IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
19 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
18 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
17 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016 
16 IC  Asian eBiz  Integration of RFID and Web Services Technology in MES Gunnam Ong    2007