55 | IC | IBERC |
An Ontology-Based Framework for e-Business Integration
| Tai-Woo Chang | | 2003 |
54 | IC | ICARCV |
A Discrete Control Approach to Robotic Cell Operating System Design
| Jonghun Park | | 1996 |
53 | IC | ICAT |
A study on RFID user memory applications for production management and scheduling
| Kyoungmin Kim | Kyoungmin Kim | 2015 |
52 | IC | ICCSA |
Efficient Mapping Rule of IDEF for UMM Application
| Kitae Shin | | 2005 |
51 | IC | ICDMCE |
Study on smart disaster recovery system using Internet of Things
| Sumin Han | Gyusun Hwang | 2016 |
50 | IC | ICICIC |
Evaluation of Intelligent Service System for the Middle-of-Life Product
| Soyeon Yoon | | 2011 |
49 | IC | ICIMSA |
Internet of Things-Enabled Supply Chain Performance Measurement Model
| Abdallah J. Dweekat | Abdallah J. Dweekat | 2016 |
48 | IC | ICLS |
Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles
| Donghyun Kim | | 2012 |
47 | IC | ICMA |
Machine-Understandable e-Business Modeling with Ontology
| Tai-Woo Chang | | 2002 |
46 | IC | ICOIN |
Analysis of Paris Metro Pricing for Wireless Internet Services
| Dongmyung Lee | | 2011 |
45 | IC | ICPR |
Business Process Modeling for developing a performance measurement system using the Internet of Things
| Gyusun Hwang | Jinwoo Park | 2015 |
44 | IC | ICPR |
A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming
| ChangUk Kim | | 1997 |
43 | IC | ICPR |
A Scheduling Algorithm considering Subcontract cost in MRP Environment
| Kichang Lee | | 1997 |
42 | IC | ICPR |
An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract
| Daeyoung Chung | | 2000 |
41 | IC | ICPR |
Development of a Decision Support System for the formulation of Manufacturing
| Kichang Lee | | 2001 |
40 | IC | ICPR |
Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain
| Sungwon Jung | | 2003 |
39 | IC | ICPR |
A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment
| Hyoung-Gon Lee | | 2007 |
38 | IC | ICPR |
A New Scheduling Paradigm Based on Farsighted Indices
| Hongbum Na | | 2009 |
37 | IC | ICPR |
A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints
| Hongbum Na | | 2011 |
» | IC | ICPR |
The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell
| Jinwu S | | 2013 |