author Kichang Lee 
2nd author / Kitae Kim (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 1997년 08월 04일 ~ 1997년 08월 05일
City: Osaka
Nation: Japan
Additional Information:
The 14th International Conference on Production Research, pp.1068-1071. 
year 1997 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Scheduling, Due Date, Subcontract Cost, Heuristic 
abstract Customer satisfaction is becoming more and more important issue in enterprise environments these days. And meeting due-dates may be one of the most critical necessary conditions in satisfying customer needs. In this respect, many researchers have tried to develop good scheduling algorithms to observe due-dates. Most of these efforts tried to minimize some tardiness related measures by assigning heavy penalty costs when due-dates are violated while considering fixed production capacities. A more practical approach to circumvent the problem may be to use subcontracting mechanism. The production environment of this research may be considered as a flexible flow line. And the objective function of the problem is to minimize the subcontract cost while observing due-date and focusing on the possibilities of subcontracting. The solution methodology adopted in this research is an effective heuristic algorithm based on backward schedule generation and forward search & modification method. The experimental results of this heuristic were shown to be very fast and efficient and in many cases were same with optimal solution.. 

Download:

번호 category 학회 제목 author presenter year
15 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
14 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
13 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
12 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
11 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
10 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
9 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
8 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
7 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
6 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
5 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
4 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
3 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
2 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
1 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012