author Seunghyun Yoon 
2nd author / Kichang Lee (Dept. of Industrial Engineering, Seoul National University)
/ Chankwon Park (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 06월 18일 ~ 2000년 06월 21일
City: Seoul
Nation: Korea
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 INFORMS-KORMS 
keywords MRP, Capacity Constraint, Dynamic Lead Time, Event-driven, Object-oriented 
abstract The traditional descriptions of MRP system almost always assume time buckets, fixed lead time, and infinite capacity. This research presents new MRP method considering capacity constraints and dynamic lead time. This method uses event-driven approach, which schedules all the operations of a job to finite capacity when an order is entered. It also uses BOMfr(Bill of Manufacture) to integrate BOM, routing, capacity and current order status. For each machine's detailed schedule, JOS(Job oriented scheduling) is used. The prototype system has been developed with COM. Data model is represented with UML(Unified Modeling Language). The system consists of MRP LOGIC COM for the MRP system's logic and MRP DB COM for persistent data storage. The modules developed with COM component show higher reusability and maintainability than traditional object-oriented system. 

Download:

번호 category 학회 제목 author presenter year
15 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
14 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
13 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
12 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
11 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
10 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
9 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
8 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
7 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
6 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
5 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
4 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
3 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
2 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
1 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012