author Gyusun Hwang 
2nd author Jinwoo Park 
presenter Jinwoo Park 
info  
year 2015 
category IC 
start / end date 2015-08-02 ~ 2015-08-06 
city / nation 마닐라/필리핀 
학회 ICPR 
keywords Business Process Modeling; Internet of Things; Performance measurement 
abstract The concept of Internet of Things (IoT) is important in collecting the shop floor data and transmitting it into the Information System in real time. The rapid proliferation of IoT in recent days has given rise to demands for clear definition among metrics as important sources of the performance measurement. This requirement comes from the various usage of IoT data: One raw IoT data is able to produce many metrics. In order to understand it, we need to consider the usage points of IoT data at different management levels. And by composing company management levels: Strategic level, Tactical level and Operational levels, we are able to analysis usage of IoT data among management levels.
The purpose of this study is to present the work flow of the performance measurement process with regard to monitoring the IoT outcomes. Also, we try to explore the core issues with Business Process Modelling and simulation. As a result of study, we expect that how IoT data is processed and which level needs an IoT data as a performance metrics.
We use BPM as a description of activities that constitute a performance measurement. Those are described in a graphical way using some components: Agent, Resources, Process, flow logic, and etc.The identification and discussion of result of BPM reflects how IoT data is handled and make a clear distinction of metrics usage among management levels. 
번호 category 학회 제목 author presenter year
15 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
14 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
13 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
12 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
11 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
10 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
9 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
8 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
7 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
6 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
5 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
4 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
3 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
2 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
1 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012